Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
273
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0149 # 01 Y:1984 | 01 | 1984 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $34,443 | $3,262 | Implemented |
KU0149 # 09 Y:1984 | 09 | 1984 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,551 | $300 | Implemented |
KU0148 # 05 Y:1984 | 05 | 1984 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $366 | $100 | Implemented |
KU0149 # 16 Y:1984 | 16 | 1984 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,367 | $30 | Implemented |
KU0148 # 12 Y:1984 | 12 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,177 | $17 | Implemented |
KU0148 # 09 Y:1984 | 09 | 1984 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $298 | $12 | Implemented |
KU0149 # 23 Y:1984 | 23 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $4,551 | $1,425 | Implemented |
KU0148 # 02 Y:1984 | 02 | 1984 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,754 | $3,000 | Implemented |
KU0149 # 13 Y:1984 | 13 | 1984 | UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING | $911 | $820 | Implemented |
KU0149 # 12 Y:1984 | 12 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $125 | $20 | Implemented |
KU0149 # 10 Y:1984 | 10 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $586 | $300 | Implemented |
KU0148 # 14 Y:1984 | 14 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $760 | $0 | Implemented |
KU0149 # 24 Y:1984 | 24 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $486 | $0 | Implemented |
KU0148 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,910 | $36 | Implemented |
KU0149 # 26 Y:1984 | 26 | 1984 | REPAIR AND ELIMINATE STEAM LEAKS | $276 | $300 | Implemented |
KU0149 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $3,920 | $350 | Implemented |
KU0148 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $514 | $800 | Implemented |
KU0149 # 20 Y:1984 | 20 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $310 | $550 | Implemented |
KU0149 # 21 Y:1984 | 21 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $278 | $0 | Implemented |
KU0149 # 25 Y:1984 | 25 | 1984 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,579 | $500 | Implemented |
KU0148 # 10 Y:1984 | 10 | 1984 | REDUCE VENTILATION AIR | $2,954 | $500 | Implemented |
KU0148 # 04 Y:1984 | 04 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $436 | $700 | Implemented |
KU0149 # 03 Y:1984 | 03 | 1984 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $965 | $400 | Implemented |
KU0148 # 13 Y:1984 | 13 | 1984 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,182 | $2,000 | Implemented |
KU0146 # 21 Y:1984 | 21 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $1,821 | $1,400 | Implemented |