IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,902

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0331 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $59,232 $1,300 Not Implemented
LE0331 # 02 Y:2012 02 2012 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $42,903 $73,485 Not Implemented
LE0331 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $36,201 $136,500 Not Implemented
LE0331 # 04 Y:2012 04 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $24,579 $0 Implemented
LE0331 # 05 Y:2012 05 2012 REDESIGN PROCESS $20,100 $0 Implemented
LE0331 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,156 $12,800 Not Implemented
LE0331 # 07 Y:2012 07 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,134 $2,500 Implemented
LE0331 # 08 Y:2012 08 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,005 $1,000 Implemented
LE0331 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $805 $125 Not Implemented
LE0329 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,610 $25,300 Not Implemented
LE0329 # 02 Y:2011 02 2011 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $50,301 $8,250 Not Implemented
LE0329 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,228 $86,000 Not Implemented
LE0329 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,539 $30,000 Not Implemented
LE0329 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,298 $1,000 Not Implemented
LE0328 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,447 $60,000 Not Implemented
LE0328 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,435 $12,420 Implemented
LE0328 # 03 Y:2011 03 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $12,853 $18,000 Implemented
LE0328 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,650 $3,000 Implemented
LE0328 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,369 $15,675 Implemented
LE0328 # 06 Y:2011 06 2011 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,743 $3,000 Not Implemented
LE0328 # 07 Y:2011 07 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,383 $2,500 Implemented
LE0328 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $2,714 $540 Not Implemented
LE0330 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $67,588 $491,000 Not Implemented
LE0330 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,277 $1,600 Not Implemented
LE0330 # 03 Y:2011 03 2011 INSTALL TIMERS AND/OR THERMOSTATS $10,060 $600 Implemented