IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

936

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LM0081 # 05 Y:2004 05 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $233,065 $1,000 Not Implemented
LM0081 # 06 Y:2004 06 2004 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $292,248 $4,925 Not Implemented
LM0081 # 07 Y:2004 07 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,611 $1,814 Not Implemented
LM0080 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $621 $475 Implemented
LM0080 # 02 Y:2004 02 2004 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $266 $165 Not Implemented
LM0080 # 03 Y:2004 03 2004 ADJUST BURNERS FOR EFFICIENT OPERATION $537 $0 Implemented
LM0080 # 04 Y:2004 04 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $28,600 $20,592 Not Implemented
LM0080 # 05 Y:2004 05 2004 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,467 $6,000 Not Implemented
LM0080 # 06 Y:2004 06 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $23,164 $300 Implemented
LM0080 # 07 Y:2004 07 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $869 $0 Not Implemented
LM0079 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,448 $410 Not Implemented
LM0079 # 02 Y:2004 02 2004 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $846 $30 Not Implemented
LM0079 # 03 Y:2004 03 2004 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,758 $8,250 Not Implemented
LM0079 # 04 Y:2004 04 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,000 $3,122 Not Implemented
LM0079 # 05 Y:2004 05 2004 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $1,045 $0 Not Implemented
LM0078 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,800 $1,220 Implemented
LM0078 # 02 Y:2004 02 2004 ELIMINATE LEAKS IN WATER LINES AND VALVES $5,717 $400 Implemented
LM0078 # 03 Y:2004 03 2004 REPAIR AND ELIMINATE STEAM LEAKS $4,064 $264 Implemented
LM0078 # 04 Y:2004 04 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $5,504 $1,585 Implemented
LM0078 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $238 $142 Implemented
LM0078 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,731 $0 Not Implemented
LM0078 # 07 Y:2004 07 2004 INSTALL AUTOMATIC PACKING EQUIPMENT $182,520 $80,000 Not Implemented
LM0078 # 08 Y:2004 08 2004 OPTIMIZE LOT SIZES TO REDUCE INVENTORY CARRYING COSTS $150,678 $1,000 Implemented
LM0078 # 09 Y:2004 09 2004 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $78,000 $2,372 Not Implemented
LM0078 # 10 Y:2004 10 2004 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS $298,998 $56,840 Implemented