Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,766
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0562 # 05 Y:2004 | 05 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,626 | $250 | Implemented |
MA0562 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $361 | $512 | Implemented |
MA0558 # 01 Y:2004 | 01 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,200 | $4,500 | Implemented |
MA0558 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $12,830 | $5,000 | Implemented |
MA0558 # 04 Y:2004 | 04 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $12,494 | $4,680 | Implemented |
MA0558 # 06 Y:2004 | 06 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,912 | $0 | Implemented |
MA0558 # 07 Y:2004 | 07 | 2004 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,965 | $2,690 | Implemented |
MA0557 # 02 Y:2004 | 02 | 2004 | INSULATE BARE EQUIPMENT | $5,528 | $3,118 | Implemented |
MA0557 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,428 | $3,450 | Implemented |
MA0557 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $1,706 | $708 | Implemented |
MA0557 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $470 | $1,340 | Implemented |
MA0556 # 02 Y:2004 | 02 | 2004 | OPTIMIZE PLANT POWER FACTOR | $13,042 | $6,750 | Implemented |
MA0556 # 03 Y:2004 | 03 | 2004 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,720 | $10,350 | Implemented |
MA0556 # 04 Y:2004 | 04 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,840 | $2,131 | Implemented |
MA0556 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,167 | $10,200 | Implemented |
MA0556 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,534 | $529 | Implemented |
MA0554 # 05 Y:2004 | 05 | 2004 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $6,330 | $8,961 | Implemented |
MA0554 # 06 Y:2004 | 06 | 2004 | INSULATE FEEDWATER TANK | $1,784 | $1,300 | Implemented |
MA0555 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,625 | $986,100 | Implemented |
MA0555 # 02 Y:2004 | 02 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,690 | $81,637 | Implemented |
MA0555 # 03 Y:2004 | 03 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,915 | $44,790 | Implemented |
MA0555 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,282 | $5,430 | Implemented |
MA0555 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $2,840 | $500 | Implemented |
MA0555 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,791 | $4,850 | Implemented |
MA0555 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $1,836 | $768 | Implemented |