IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

107

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS035 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,986 $2,000 Implemented
MAS035 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,443 $0 Implemented
MA0703 # 01 Y:2012 01 2012 OPTIMIZE PLANT POWER FACTOR $10,588 $9,425 Implemented
MA0703 # 09 Y:2012 09 2012 TURN OFF STEAM / HOT WATER LINES LEADING TO SPACE HEATING UNITS $332 $150 Implemented
MA0703 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,254 $100 Implemented
MAS034 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,178 $7,500 Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
MAS032 # 06 Y:2012 06 2012 INSULATE BARE EQUIPMENT $256 $400 Implemented
MA0702 # 01 Y:2012 01 2012 REDUCE FLUID FLOW RATES $11,375 $9,400 Implemented
MA0702 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $868 $3,000 Implemented
MA0702 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,144 $1,500 Implemented
MAS031 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $593 $425 Implemented
MAS031 # 02 Y:2012 02 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,552 $150 Implemented
MAS030 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,379 $0 Implemented
MAS030 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,092 $0 Implemented
MAS029 # 05 Y:2012 05 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,392 $0 Implemented
MAS029 # 04 Y:2012 04 2012 RECOVER WASTE HEAT FROM EQUIPMENT $3,313 $4,270 Implemented
MAS029 # 01 Y:2012 01 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $13,149 $500 Implemented
MA0701 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $7,855 $11,200 Implemented
MA0701 # 06 Y:2012 06 2012 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $5,286 $500 Implemented
MA0701 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $9,553 $47,000 Implemented
MA0700 # 05 Y:2012 05 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,934 $500 Implemented
MA0700 # 06 Y:2012 06 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,148 $500 Implemented
MA0700 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $3,503 $500 Implemented
MA0700 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,265 $500 Implemented