IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,209

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0656 # 04 Y:2010 04 2010 RECOVER WASTE HEAT FROM EQUIPMENT $16,891 $15,755 Not Implemented
MA0656 # 05 Y:2010 05 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,718 $3,915 Implemented
MA0656 # 06 Y:2010 06 2010 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $36,936 $68,200 Implemented
MA0656 # 07 Y:2010 07 2010 BURN A LESS EXPENSIVE GRADE OF FUEL $54,013 $100,000 Implemented
MA0656 # 08 Y:2010 08 2010 INSTALL OCCUPANCY SENSORS $1,714 $3,865 Implemented
MA0651 # 01 Y:2009 01 2009 REDUCE VENTILATION AIR $18,774 $1,000 Not Implemented
MA0651 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,340 $96,800 Implemented
MA0651 # 03 Y:2009 03 2009 REPLACE BOILER $10,080 $30,700 Implemented
MA0651 # 04 Y:2009 04 2009 COVER OPEN TANKS $10,013 $5,866 Not Implemented
MA0651 # 05 Y:2009 05 2009 INSULATE BARE EQUIPMENT $2,941 $3,219 Not Implemented
MA0651 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,725 $18,300 Not Implemented
MA0650 # 01 Y:2009 01 2009 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,218 $10,000 Not Implemented
MA0650 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $1,735 $0 Implemented
MA0650 # 03 Y:2009 03 2009 REDUCE VENTILATION AIR $581 $2,300 Implemented
MA0650 # 04 Y:2009 04 2009 REDUCE VENTILATION AIR $250 $0 Implemented
MA0650 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $213 $0 Implemented
MA0646 # 01 Y:2009 01 2009 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $7,158 $8,683 Not Implemented
MA0646 # 02 Y:2009 02 2009 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,780 $0 Implemented
MA0646 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $1,968 $3,610 Not Implemented
MA0646 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,508 $300 Implemented
MA0646 # 05 Y:2009 05 2009 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,450 $5,195 Not Implemented
MA0632 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,404 $14,500 Implemented
MA0632 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,185 $17,080 Not Implemented
MA0632 # 03 Y:2008 03 2008 AIR CONDITION ONLY SPACE NECESSARY $4,818 $19,300 Not Implemented
MA0632 # 04 Y:2008 04 2008 RECOVER WASTE HEAT FROM EQUIPMENT $3,265 $4,100 Implemented