IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,209

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0632 # 05 Y:2008 05 2008 REDUCE VENTILATION AIR $2,499 $9,000 Implemented
MA0632 # 06 Y:2008 06 2008 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH $2,149 $11,000 Not Implemented
MA0632 # 07 Y:2008 07 2008 INSULATE BARE EQUIPMENT $383 $650 Implemented
MA0627 # 01 Y:2008 01 2008 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $52,302 $35,000 Implemented
MA0627 # 02 Y:2008 02 2008 REDUCE VENTILATION AIR $8,813 $16,000 Implemented
MA0627 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $6,984 $8,550 Implemented
MA0627 # 04 Y:2008 04 2008 USE MINIMUM SAFE OVEN VENTILATION $6,674 $5,000 Not Implemented
MA0627 # 05 Y:2008 05 2008 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,648 $4,300 Not Implemented
MA0627 # 06 Y:2008 06 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $948 $1,000 Implemented
MA0628 # 01 Y:2008 01 2008 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $10,924 $18,000 Implemented
MA0628 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,555 $2,800 Implemented
MA0628 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,591 $4,000 Implemented
MA0628 # 04 Y:2008 04 2008 INSTALL OCCUPANCY SENSORS $566 $2,285 Not Implemented
MA0628 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $305 $290 Implemented
MA0626 # 01 Y:2007 01 2007 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $67,278 $157,500 Not Implemented
MA0626 # 02 Y:2007 02 2007 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $6,543 $8,000 Not Implemented
MA0626 # 03 Y:2007 03 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $5,346 $0 Not Implemented
MA0626 # 04 Y:2007 04 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $3,465 $2,500 Not Implemented
MA0626 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,602 $5,481 Not Implemented
MA0626 # 06 Y:2007 06 2007 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $395 $200 Not Implemented
MA0623 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,848 $117,000 Not Implemented
MA0623 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,363 $50,282 Not Implemented
MA0623 # 03 Y:2007 03 2007 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,297 $1,184 Implemented
MA0623 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $643 $460 Implemented
MA0621 # 01 Y:2007 01 2007 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $61,876 $354,790 Not Implemented