Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0423 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,279 | $80,000 | Not Implemented |
MA0423 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $585 | $2,627 | Implemented |
MA0423 # 06 Y:1998 | 06 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $187 | $294 | Not Implemented |
MA0423 # 07 Y:1998 | 07 | 1998 | INSTALL OCCUPANCY SENSORS | $149 | $257 | Not Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
MA0422 # 01 Y:1998 | 01 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,664 | $120,000 | Not Implemented |
MA0422 # 02 Y:1998 | 02 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,889 | $3,625 | Not Implemented |
MA0422 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $764 | $0 | Implemented |
MA0422 # 04 Y:1998 | 04 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $452 | $1,270 | Implemented |
MA0422 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $337 | $346 | Implemented |
MA0422 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $236 | $776 | Implemented |
MA0430 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $5,357 | $300 | Implemented |
MA0430 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,264 | $0 | Not Implemented |
MA0430 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $711 | $1,840 | Implemented |
MA0430 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,777 | $10,080 | Not Implemented |
MA0430 # 05 Y:1998 | 05 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,070 | $27,413 | Not Implemented |
MA0430 # 06 Y:1998 | 06 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $56,116 | $21,247 | Not Implemented |
MA0430 # 07 Y:1998 | 07 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,518 | $800 | Implemented |
MA0430 # 08 Y:1998 | 08 | 1998 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,048 | $75 | Implemented |
MA0430 # 09 Y:1998 | 09 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,863 | $15,850 | Not Implemented |
MA0429 # 01 Y:1998 | 01 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $14,812 | $19,107 | Not Implemented |