IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0359 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $604 $350 Not Implemented
MA0358 # 01 Y:1996 01 1996 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $3,000 $2,800 Not Implemented
MA0358 # 02 Y:1996 02 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,147 $4,650 Not Implemented
MA0358 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,080 $0 Not Implemented
MA0358 # 04 Y:1996 04 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $742 $1,100 Not Implemented
MA0358 # 05 Y:1996 05 1996 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $377 $0 Not Implemented
MA0357 # 01 Y:1996 01 1996 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $72,723 $72,500 Not Implemented
MA0357 # 02 Y:1996 02 1996 FILTER AND REUSE HYDRAULIC OIL $13,997 $734 Not Implemented
MA0357 # 03 Y:1996 03 1996 USE SYNTHETIC LUBRICANT $6,765 $1,200 Not Implemented
MA0357 # 04 Y:1996 04 1996 UPGRADE CONTROLS ON COMPRESSORS $4,822 $6,000 Not Implemented
MA0356 # 01 Y:1996 01 1996 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $29,400 $118,450 Implemented
MA0356 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,644 $3,000 Implemented
MA0356 # 03 Y:1996 03 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,838 $0 Implemented
MA0356 # 04 Y:1996 04 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,672 $10,000 Not Implemented
MA0356 # 05 Y:1996 05 1996 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $448 $0 Not Implemented
MA0355 # 01 Y:1996 01 1996 INSTALL SET-BACK TIMERS $4,082 $0 Not Implemented
MA0355 # 02 Y:1996 02 1996 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $4,520 $2,700 Implemented
MA0355 # 03 Y:1996 03 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $3,840 $2,200 Not Implemented
MA0355 # 04 Y:1996 04 1996 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $5,576 $24,000 Not Implemented
MA0355 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,888 $52,000 Implemented
MA0355 # 06 Y:1996 06 1996 REUSE / RECYCLE/ SELL PAPER PRODUCTS $960 $79 Implemented
MA0355 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $62 $102 Not Implemented
MA0354 # 01 Y:1996 01 1996 USE RADIANT HEATER FOR SPOT HEATING $23,668 $72,000 Implemented
MA0354 # 02 Y:1996 02 1996 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $2,604 $5,000 Not Implemented
MA0354 # 03 Y:1996 03 1996 INSULATE BARE EQUIPMENT $2,340 $4,335 Not Implemented