Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0359 # 06 Y:1996 | 06 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $604 | $350 | Not Implemented |
MA0358 # 01 Y:1996 | 01 | 1996 | SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE | $3,000 | $2,800 | Not Implemented |
MA0358 # 02 Y:1996 | 02 | 1996 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,147 | $4,650 | Not Implemented |
MA0358 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,080 | $0 | Not Implemented |
MA0358 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $742 | $1,100 | Not Implemented |
MA0358 # 05 Y:1996 | 05 | 1996 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $377 | $0 | Not Implemented |
MA0357 # 01 Y:1996 | 01 | 1996 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $72,723 | $72,500 | Not Implemented |
MA0357 # 02 Y:1996 | 02 | 1996 | FILTER AND REUSE HYDRAULIC OIL | $13,997 | $734 | Not Implemented |
MA0357 # 03 Y:1996 | 03 | 1996 | USE SYNTHETIC LUBRICANT | $6,765 | $1,200 | Not Implemented |
MA0357 # 04 Y:1996 | 04 | 1996 | UPGRADE CONTROLS ON COMPRESSORS | $4,822 | $6,000 | Not Implemented |
MA0356 # 01 Y:1996 | 01 | 1996 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $29,400 | $118,450 | Implemented |
MA0356 # 02 Y:1996 | 02 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,644 | $3,000 | Implemented |
MA0356 # 03 Y:1996 | 03 | 1996 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,838 | $0 | Implemented |
MA0356 # 04 Y:1996 | 04 | 1996 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,672 | $10,000 | Not Implemented |
MA0356 # 05 Y:1996 | 05 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $448 | $0 | Not Implemented |
MA0355 # 01 Y:1996 | 01 | 1996 | INSTALL SET-BACK TIMERS | $4,082 | $0 | Not Implemented |
MA0355 # 02 Y:1996 | 02 | 1996 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,520 | $2,700 | Implemented |
MA0355 # 03 Y:1996 | 03 | 1996 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $3,840 | $2,200 | Not Implemented |
MA0355 # 04 Y:1996 | 04 | 1996 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $5,576 | $24,000 | Not Implemented |
MA0355 # 05 Y:1996 | 05 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,888 | $52,000 | Implemented |
MA0355 # 06 Y:1996 | 06 | 1996 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $960 | $79 | Implemented |
MA0355 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $62 | $102 | Not Implemented |
MA0354 # 01 Y:1996 | 01 | 1996 | USE RADIANT HEATER FOR SPOT HEATING | $23,668 | $72,000 | Implemented |
MA0354 # 02 Y:1996 | 02 | 1996 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $2,604 | $5,000 | Not Implemented |
MA0354 # 03 Y:1996 | 03 | 1996 | INSULATE BARE EQUIPMENT | $2,340 | $4,335 | Not Implemented |