IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0300 # 05 Y:1994 05 1994 DISCONNECT BALLASTS $1,042 $67 Implemented
MA0300 # 06 Y:1994 06 1994 REPAIR OR REPLACE STEAM TRAPS $5,397 $2,232 Implemented
MA0300 # 07 Y:1994 07 1994 TURN OFF EQUIPMENT WHEN NOT IN USE $1,658 $0 Not Implemented
MA0300 # 08 Y:1994 08 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $506 $0 Implemented
MA0294 # 01 Y:1994 01 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,312 $0 Not Implemented
MA0294 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,287 $2,112 Not Implemented
MA0294 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $410 $91 Implemented
MA0294 # 04 Y:1994 04 1994 INSTALL OCCUPANCY SENSORS $263 $563 Not Implemented
MA0294 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $286 $1,309 Not Implemented
MA0294 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $205 $0 Implemented
MA0302 # 01 Y:1994 01 1994 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $19,139 $8,246 Not Implemented
MA0302 # 02 Y:1994 02 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,102 $180 Implemented
MA0302 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $8,142 $25,365 Not Implemented
MA0302 # 04 Y:1994 04 1994 BURN A LESS EXPENSIVE GRADE OF FUEL $9,629 $17,304 Implemented
MA0302 # 05 Y:1994 05 1994 INSTALL SET-BACK TIMERS $3,309 $254 Implemented
MA0302 # 06 Y:1994 06 1994 INSTALL OCCUPANCY SENSORS $1,995 $1,466 Implemented
MA0302 # 07 Y:1994 07 1994 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,628 $6,425 Implemented
MA0301 # 01 Y:1994 01 1994 REDUCE FLUID FLOW RATES $480,000 $657,000 Implemented
MA0301 # 02 Y:1994 02 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,698 $27,600 Not Implemented
MA0301 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,256 $4,383 Implemented
MA0301 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,228 $0 Implemented
MA0301 # 05 Y:1994 05 1994 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $3,790 $1,236 Not Implemented
MA0301 # 06 Y:1994 06 1994 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $1,830 $5,906 Not Implemented
MA0301 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,277 $2,540 Not Implemented
MA0299 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,014 $102,795 Not Implemented