IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0250 # 05 Y:1992 05 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $1,289 $0 Implemented
MA0244 # 01 Y:1992 01 1992 INSTALL SET-BACK TIMERS $822 $528 Not Implemented
MA0244 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $156 $0 Implemented
MA0244 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $494 $319 Implemented
MA0244 # 04 Y:1992 04 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,327 $300 Implemented
MA0244 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,405 $3,381 Implemented
MA0244 # 06 Y:1992 06 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $1,118 $246 Not Implemented
MA0245 # 01 Y:1992 01 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,316 $0 Not Implemented
MA0245 # 02 Y:1992 02 1992 REDESIGN PROCESS $4,412 $1,554 Implemented
MA0245 # 03 Y:1992 03 1992 RECOVER AND REUSE COOLING WATER $2,833 $5,040 Implemented
MA0245 # 04 Y:1992 04 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,237 $0 Implemented
MA0246 # 01 Y:1992 01 1992 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,746 $3,614 Not Implemented
MA0246 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $1,358 $2,672 Implemented
MA0246 # 03 Y:1992 03 1992 RECOVER WASTE HEAT FROM EQUIPMENT $1,645 $1,995 Not Implemented
MA0246 # 04 Y:1992 04 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $526 $0 Implemented
MA0246 # 05 Y:1992 05 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $443 $386 Implemented
MA0246 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $100 $85 Implemented
MA0248 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,681 $30,404 Not Implemented
MA0248 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,051 $10 Implemented
MA0248 # 03 Y:1992 03 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,622 $1,872 Implemented
MA0248 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,618 $-2,762 Not Implemented
MA0248 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,229 $7,164 Not Implemented
MA0248 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $268 $150 Not Implemented
MA0248 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $0 Not Implemented
MA0243 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,894 $33 Implemented