Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
102
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0607 # 03 Y:2006 | 03 | 2006 | BURN A LESS EXPENSIVE GRADE OF FUEL | $14,261 | $5,500 | Not Implemented |
MA0607 # 05 Y:2006 | 05 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $12,223 | $14,000 | Not Implemented |
MA0607 # 02 Y:2006 | 02 | 2006 | REDUCE VENTILATION AIR | $45,943 | $10,400 | Not Implemented |
MA0607 # 01 Y:2006 | 01 | 2006 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $46,963 | $0 | Not Implemented |
MA0607 # 06 Y:2006 | 06 | 2006 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $10,577 | $1,870 | Not Implemented |
MA0607 # 07 Y:2006 | 07 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $6,860 | $3,500 | Not Implemented |
MA0607 # 04 Y:2006 | 04 | 2006 | REDUCE VENTILATION AIR | $12,889 | $1,700 | Not Implemented |
MA0565 # 02 Y:2004 | 02 | 2004 | $57,540 | $40,000 | Implemented | |
MA0565 # 01 Y:2004 | 01 | 2004 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $216,000 | $125,000 | Implemented |
MA0565 # 03 Y:2004 | 03 | 2004 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $5,088 | $8,000 | Not Implemented |
MA0565 # 04 Y:2004 | 04 | 2004 | REPLACE BOILER | $2,760 | $750 | Implemented |
MA0565 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $2,705 | $754 | Implemented |
MA0565 # 06 Y:2004 | 06 | 2004 | INSULATE FEEDWATER TANK | $873 | $300 | Implemented |
MA0565 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $656 | $548 | Not Implemented |
MA0564 # 05 Y:2004 | 05 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $122 | $548 | Implemented |
MA0564 # 04 Y:2004 | 04 | 2004 | INSULATE BARE EQUIPMENT | $168 | $75 | Not Implemented |
MA0564 # 01 Y:2004 | 01 | 2004 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $20,000 | $0 | Not Implemented |
MA0564 # 02 Y:2004 | 02 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,419 | $10,531 | Not Implemented |
MA0564 # 03 Y:2004 | 03 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,406 | $3,226 | Not Implemented |
MA0563 # 01 Y:2004 | 01 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $39,550 | $12,000 | Implemented |
MA0563 # 04 Y:2004 | 04 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $116 | $0 | Implemented |
MA0563 # 03 Y:2004 | 03 | 2004 | INSTALL OCCUPANCY SENSORS | $257 | $155 | Not Implemented |
MA0563 # 02 Y:2004 | 02 | 2004 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,769 | $650 | Implemented |
MA0500 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $14,725 | $35,000 | Implemented |
MA0500 # 05 Y:2001 | 05 | 2001 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,562 | $18,000 | Not Implemented |