IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0756 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,102 $6,500 Implemented
MA0756 # 02 Y:2016 02 2016 INSTALL OCCUPANCY SENSORS $6,277 $2,320 Not Implemented
MA0756 # 03 Y:2016 03 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,797 $7,000 Implemented
MA0756 # 04 Y:2016 04 2016 REDUCE VENTILATION AIR $1,278 $1,000 Not Implemented
MA0756 # 05 Y:2016 05 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $1,508 $10,800 Not Implemented
MA0756 # 06 Y:2016 06 2016 OPTIMIZE PLANT POWER FACTOR $576 $1,392 Not Implemented
MA0754 # 01 Y:2016 01 2016 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $1,595,248 $5,445,000 Not Implemented
MA0754 # 02 Y:2016 02 2016 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $112,215 $1,000 Not Implemented
MA0754 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,309 $500,000 Not Implemented
MA0754 # 04 Y:2016 04 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $62,104 $250,000 Not Implemented
MA0754 # 05 Y:2016 05 2016 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $34,769 $3,000 Implemented
MA0754 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,043 $13,895 Implemented
MA0754 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,913 $4,940 Implemented
MA0754 # 08 Y:2016 08 2016 REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE $1,151 $500 Not Implemented
MA0755 # 01 Y:2016 01 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $73,133 $200,000 Not Implemented
MA0755 # 02 Y:2016 02 2016 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $43,907 $196,307 Not Implemented
MA0755 # 03 Y:2016 03 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $10,196 $21,560 Implemented
MA0755 # 04 Y:2016 04 2016 RECOVER WASTE HEAT FROM EQUIPMENT $9,821 $4,300 Not Implemented
MA0755 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,678 $6,000 Not Implemented
MA0755 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,653 $2,955 Not Implemented
MA0753 # 01 Y:2015 01 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,534 $67,200 Not Implemented
MA0753 # 02 Y:2015 02 2015 REDUCE VENTILATION AIR $7,290 $5,575 Implemented
MA0753 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $4,632 $6,000 Implemented
MA0753 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,608 $4,608 Implemented
MA0753 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $1,226 $1,400 Implemented