IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0500 # 03 Y:2001 03 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,719 $20,000 Not Implemented
MA0500 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $14,725 $35,000 Implemented
MA0500 # 05 Y:2001 05 2001 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $13,562 $18,000 Not Implemented
MA0500 # 06 Y:2001 06 2001 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $9,262 $10,000 Not Implemented
MA0500 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,051 $12,900 Not Implemented
MA0500 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,264 $2,000 Implemented
MA0500 # 09 Y:2001 09 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,225 $5,950 Not Implemented
MA0248 # 01 Y:1992 01 1992 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,681 $30,404 Not Implemented
MA0248 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,051 $10 Implemented
MA0248 # 03 Y:1992 03 1992 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $2,622 $1,872 Implemented
MA0248 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,618 $-2,762 Not Implemented
MA0248 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,229 $7,164 Not Implemented
MA0248 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $268 $150 Not Implemented
MA0248 # 07 Y:1992 07 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $829 $0 Not Implemented
MA0242 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,258 $18,756 Not Implemented
MA0242 # 02 Y:1992 02 1992 INSTALL SET-BACK TIMERS $1,047 $800 Implemented
MA0242 # 03 Y:1992 03 1992 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $996 $0 Implemented
MA0242 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $712 $0 Not Implemented
MA0242 # 05 Y:1992 05 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $531 $0 Implemented
MA0242 # 06 Y:1992 06 1992 INSULATE BARE EQUIPMENT $289 $864 Not Implemented
MA0239 # 01 Y:1992 01 1992 AIR CONDITION ONLY SPACE NECESSARY $6,633 $0 Implemented
MA0239 # 02 Y:1992 02 1992 UPGRADE OBSOLETE EQUIPMENT $5,505 $61,500 Implemented
MA0239 # 03 Y:1992 03 1992 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $4,762 $75 Implemented
MA0239 # 04 Y:1992 04 1992 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $1,145 $0 Not Implemented
MA0239 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,206 $1,265 Implemented