IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

305

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0604 # 04 Y:2006 04 2006 OPTIMIZE FILTRATION CLEANING / REPLACEMENT TO MINIMIZE AIR RESISTANCE $8,539 $8,050 Implemented
MA0604 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,796 $67,450 Not Implemented
MA0604 # 02 Y:2006 02 2006 INSULATE BARE EQUIPMENT $20,912 $14,335 Implemented
MA0604 # 01 Y:2006 01 2006 ELIMINATE/REDUCE AN OPERATION $33,327 $2,600 Not Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,861 $138,775 Not Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0592 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,191 $368,500 Not Implemented
MA0534 # 07 Y:2003 07 2003 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $6,624 $21,000 Not Implemented
MA0534 # 01 Y:2003 01 2003 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $223,213 $1,257,060 Not Implemented
MA0534 # 02 Y:2003 02 2003 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $76,320 $57,480 Not Implemented
MA0534 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,487 $53,950 Not Implemented
MA0534 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $20,457 $67,665 Not Implemented
MA0534 # 06 Y:2003 06 2003 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $10,591 $8,425 Not Implemented
MA0534 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $4,663 $9,742 Not Implemented
MA0534 # 09 Y:2003 09 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $470 $1,416 Not Implemented
MA0534 # 05 Y:2003 05 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $19,634 $12,975 Not Implemented
MA0469 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,374 $1,010 Implemented
MA0469 # 01 Y:2000 01 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,392 $17,000 Not Implemented
MA0469 # 02 Y:2000 02 2000 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,357 $0 Implemented
MA0469 # 04 Y:2000 04 2000 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,400 $12,780 Implemented
MA0469 # 06 Y:2000 06 2000 USE WATER-BASED DEVELOPERS AND FINISHERS $527 $960 Implemented
MA0469 # 05 Y:2000 05 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $696 $1,495 Not Implemented
MA0469 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $497 $750 Implemented