Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0725 # 06 Y:2014 | 06 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $23,788 | $9,000 | Implemented |
MA0725 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,381 | $15,200 | Not Implemented |
MA0725 # 08 Y:2014 | 08 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,977 | $12,270 | Implemented |
MA0725 # 09 Y:2014 | 09 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,970 | $13,450 | Not Implemented |
MA0725 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,314 | $10,600 | Implemented |
MA0725 # 11 Y:2014 | 11 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,444 | $10,200 | Not Implemented |
MA0725 # 12 Y:2014 | 12 | 2014 | INSULATE BARE EQUIPMENT | $3,366 | $30,760 | Implemented |
MA0724 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,926 | $23,600 | Implemented |
MA0724 # 02 Y:2014 | 02 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,941 | $11,100 | Not Implemented |
MA0724 # 03 Y:2014 | 03 | 2014 | OPTIMIZE PLANT POWER FACTOR | $3,816 | $5,322 | Not Implemented |
MA0724 # 04 Y:2014 | 04 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,430 | $10,000 | Not Implemented |
MA0724 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,321 | $1,500 | Implemented |
MA0723 # 01 Y:2014 | 01 | 2014 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $23,304 | $90,000 | Implemented |
MA0723 # 02 Y:2014 | 02 | 2014 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $20,745 | $110,500 | Implemented |
MA0723 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $16,628 | $5,000 | Implemented |
MA0723 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $11,047 | $32,000 | Not Implemented |
MA0723 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,158 | $1,250 | Implemented |
MA0722 # 01 Y:2014 | 01 | 2014 | USE POWER DURING OFF-PEAK PERIODS | $11,298 | $500 | Implemented |
MA0722 # 02 Y:2014 | 02 | 2014 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $10,940 | $1,500 | Not Implemented |
MA0722 # 03 Y:2014 | 03 | 2014 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,147 | $9,900 | Not Implemented |
MA0722 # 04 Y:2014 | 04 | 2014 | REDUCE VENTILATION AIR | $2,443 | $3,000 | Not Implemented |
MA0722 # 05 Y:2014 | 05 | 2014 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $1,818 | $2,750 | Not Implemented |
MA0722 # 06 Y:2014 | 06 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,742 | $1,450 | Not Implemented |
MA0722 # 07 Y:2014 | 07 | 2014 | REDUCE VENTILATION AIR | $1,630 | $3,750 | Not Implemented |
MA0722 # 08 Y:2014 | 08 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $998 | $200 | Implemented |