Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0696 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $15,781 | $2,800 | Implemented |
MA0696 # 03 Y:2012 | 03 | 2012 | USE OPTIMUM TEMPERATURE | $6,647 | $4,000 | Not Implemented |
MA0696 # 04 Y:2012 | 04 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,539 | $17,500 | Not Implemented |
MA0696 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,048 | $6,600 | Implemented |
MA0696 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,462 | $6,035 | Not Implemented |
MA0696 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $200 | Implemented |
MA0696 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $1,705 | $4,080 | Implemented |
MA0696 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $622 | $1,100 | Not Implemented |
MA0698 # 01 Y:2012 | 01 | 2012 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,300 | $1,000 | Not Implemented |
MA0698 # 02 Y:2012 | 02 | 2012 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $8,226 | $6,500 | Not Implemented |
MA0698 # 03 Y:2012 | 03 | 2012 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $7,992 | $28,000 | Not Implemented |
MA0698 # 04 Y:2012 | 04 | 2012 | REDESIGN PROCESS | $7,448 | $22,500 | Not Implemented |
MA0698 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,082 | $4,410 | Not Implemented |
MA0698 # 06 Y:2012 | 06 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,103 | $5,900 | Not Implemented |
MA0698 # 07 Y:2012 | 07 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,076 | $9,870 | Not Implemented |
MA0697 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,439 | $22,540 | Not Implemented |
MA0697 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $67,234 | $180,000 | Not Implemented |
MA0697 # 03 Y:2012 | 03 | 2012 | IMPROVE COMBUSTION CONTROL CAPABILITY | $23,122 | $100,000 | Not Implemented |
MA0697 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $10,370 | $3,000 | Implemented |
MA0697 # 05 Y:2012 | 05 | 2012 | PAY UTILITY BILLS ON TIME | $11,678 | $500 | Implemented |
MA0697 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,779 | $3,600 | Implemented |
MA0697 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,452 | $8,700 | Not Implemented |
MA0697 # 08 Y:2012 | 08 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $659 | $500 | Not Implemented |
MAS025 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $50,701 | $22,000 | Not Implemented |
MAS025 # 02 Y:2012 | 02 | 2012 | REDUCE VENTILATION AIR | $11,105 | $10,770 | Not Implemented |