IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0693 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,573 $27,000 Not Implemented
MA0693 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $1,572 $4,200 Implemented
MA0693 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $486 $200 Not Implemented
MA0693 # 07 Y:2012 07 2012 INSULATE BARE EQUIPMENT $373 $600 Not Implemented
MA0694 # 01 Y:2012 01 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $12,023 $500 Implemented
MA0694 # 02 Y:2012 02 2012 REDUCE VENTILATION AIR $7,473 $0 Not Implemented
MA0694 # 03 Y:2012 03 2012 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $5,619 $0 Implemented
MA0694 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $3,042 $665 Not Implemented
MA0694 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $2,300 $16,608 Implemented
MA0694 # 06 Y:2012 06 2012 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $1,515 $3,410 Not Implemented
MA0694 # 07 Y:2012 07 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $503 $900 Implemented
MA0694 # 08 Y:2012 08 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $253 $900 Not Implemented
MA0692 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,573 $24,000 Not Implemented
MA0692 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,554 $33,000 Not Implemented
MA0692 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $3,685 $2,500 Not Implemented
MA0692 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,509 $200 Not Implemented
MA0692 # 05 Y:2012 05 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,162 $7,150 Not Implemented
MA0692 # 06 Y:2012 06 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,145 $3,183 Not Implemented
MA0692 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,135 $3,260 Not Implemented
MA0692 # 08 Y:2012 08 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $1,013 $3,000 Not Implemented
MA0691 # 01 Y:2012 01 2012 REPLACE BOILER $9,946 $38,400 Not Implemented
MA0691 # 02 Y:2012 02 2012 USE MINIMUM SAFE OVEN VENTILATION $9,618 $18,525 Not Implemented
MA0691 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $9,192 $42,500 Not Implemented
MA0691 # 04 Y:2012 04 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,115 $19,125 Not Implemented
MA0691 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $772 $1,575 Implemented