IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0573 # 03 Y:2005 03 2005 OPTIMIZE PLANT POWER FACTOR $5,270 $5,200 Not Implemented
MA0573 # 04 Y:2005 04 2005 INSULATE BARE EQUIPMENT $2,868 $3,920 Implemented
MA0571 # 01 Y:2005 01 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $97,224 $319,500 Not Implemented
MA0571 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $46,372 $49,355 Implemented
MA0571 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,977 $25,856 Implemented
MA0571 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $7,370 $1,900 Implemented
MA0571 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,826 $29,170 Implemented
MA0571 # 06 Y:2005 06 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,702 $1,962 Not Implemented
MA0571 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $735 $1,450 Not Implemented
MA0570 # 01 Y:2005 01 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $34,944 $79,014 Not Implemented
MA0570 # 02 Y:2005 02 2005 INSULATE BARE EQUIPMENT $27,226 $1,624 Implemented
MA0570 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $20,028 $21,736 Implemented
MA0570 # 04 Y:2005 04 2005 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $13,182 $20,800 Not Implemented
MA0570 # 05 Y:2005 05 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,127 $30,357 Implemented
MA0570 # 06 Y:2005 06 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $9,432 $32,499 Not Implemented
MA0570 # 07 Y:2005 07 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,365 $0 Implemented
MA0570 # 08 Y:2005 08 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,708 $7,000 Implemented
MA0570 # 09 Y:2005 09 2005 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $1,891 $200 Not Implemented
MA0570 # 10 Y:2005 10 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $960 $600 Implemented
MA0569 # 01 Y:2005 01 2005 USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST $67,271 $331,800 Not Implemented
MA0569 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,234 $7,312 Implemented
MA0569 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,082 $494 Implemented
MA0569 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $5,248 Implemented
MA0568 # 01 Y:2005 01 2005 ADOPT IN-HOUSE MATERIAL GENERATION $174,960 $252,000 Not Implemented
MA0568 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $20,082 $7,750 Implemented