Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,929
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0573 # 03 Y:2005 | 03 | 2005 | OPTIMIZE PLANT POWER FACTOR | $5,270 | $5,200 | Not Implemented |
MA0573 # 04 Y:2005 | 04 | 2005 | INSULATE BARE EQUIPMENT | $2,868 | $3,920 | Implemented |
MA0571 # 01 Y:2005 | 01 | 2005 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $97,224 | $319,500 | Not Implemented |
MA0571 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $46,372 | $49,355 | Implemented |
MA0571 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,977 | $25,856 | Implemented |
MA0571 # 04 Y:2005 | 04 | 2005 | USE MINIMUM SAFE OVEN VENTILATION | $7,370 | $1,900 | Implemented |
MA0571 # 05 Y:2005 | 05 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $6,826 | $29,170 | Implemented |
MA0571 # 06 Y:2005 | 06 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,702 | $1,962 | Not Implemented |
MA0571 # 07 Y:2005 | 07 | 2005 | OPTIMIZE PLANT POWER FACTOR | $735 | $1,450 | Not Implemented |
MA0570 # 01 Y:2005 | 01 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $34,944 | $79,014 | Not Implemented |
MA0570 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $27,226 | $1,624 | Implemented |
MA0570 # 03 Y:2005 | 03 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $20,028 | $21,736 | Implemented |
MA0570 # 04 Y:2005 | 04 | 2005 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $13,182 | $20,800 | Not Implemented |
MA0570 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,127 | $30,357 | Implemented |
MA0570 # 06 Y:2005 | 06 | 2005 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $9,432 | $32,499 | Not Implemented |
MA0570 # 07 Y:2005 | 07 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,365 | $0 | Implemented |
MA0570 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,708 | $7,000 | Implemented |
MA0570 # 09 Y:2005 | 09 | 2005 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $1,891 | $200 | Not Implemented |
MA0570 # 10 Y:2005 | 10 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $960 | $600 | Implemented |
MA0569 # 01 Y:2005 | 01 | 2005 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $67,271 | $331,800 | Not Implemented |
MA0569 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,234 | $7,312 | Implemented |
MA0569 # 03 Y:2005 | 03 | 2005 | INSULATE BARE EQUIPMENT | $1,082 | $494 | Implemented |
MA0569 # 04 Y:2005 | 04 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $825 | $5,248 | Implemented |
MA0568 # 01 Y:2005 | 01 | 2005 | ADOPT IN-HOUSE MATERIAL GENERATION | $174,960 | $252,000 | Not Implemented |
MA0568 # 02 Y:2005 | 02 | 2005 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $20,082 | $7,750 | Implemented |