IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0568 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,788 $12,000 Implemented
MA0568 # 04 Y:2005 04 2005 OPTIMIZE PLANT POWER FACTOR $5,122 $6,750 Implemented
MA0568 # 05 Y:2005 05 2005 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $4,092 $6,000 Implemented
MA0568 # 06 Y:2005 06 2005 RECOVER WASTE HEAT FROM EQUIPMENT $3,459 $2,888 Not Implemented
MA0562 # 01 Y:2004 01 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $22,961 $139,400 Not Implemented
MA0562 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $10,584 $2,465 Implemented
MA0562 # 03 Y:2004 03 2004 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,445 $650 Implemented
MA0562 # 04 Y:2004 04 2004 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $2,903 $0 Not Implemented
MA0562 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,626 $250 Implemented
MA0562 # 06 Y:2004 06 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $820 $1,640 Not Implemented
MA0562 # 07 Y:2004 07 2004 INSTALL OCCUPANCY SENSORS $361 $512 Implemented
MA0557 # 01 Y:2004 01 2004 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $5,922 $25,100 Not Implemented
MA0557 # 02 Y:2004 02 2004 INSULATE BARE EQUIPMENT $5,528 $3,118 Implemented
MA0557 # 03 Y:2004 03 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,428 $3,450 Implemented
MA0557 # 04 Y:2004 04 2004 INSULATE BARE EQUIPMENT $1,706 $708 Implemented
MA0557 # 05 Y:2004 05 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $470 $1,340 Implemented
MA0556 # 01 Y:2004 01 2004 IMPROVE SPACE COMFORT CONDITIONING $17,360 $17,910 Not Implemented
MA0556 # 02 Y:2004 02 2004 OPTIMIZE PLANT POWER FACTOR $13,042 $6,750 Implemented
MA0556 # 03 Y:2004 03 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,720 $10,350 Implemented
MA0556 # 04 Y:2004 04 2004 RECOVER WASTE HEAT FROM EQUIPMENT $4,840 $2,131 Implemented
MA0556 # 05 Y:2004 05 2004 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,167 $10,200 Implemented
MA0556 # 06 Y:2004 06 2004 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $5,923 $12,926 Not Implemented
MA0556 # 07 Y:2004 07 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,534 $529 Implemented
MA0554 # 01 Y:2004 01 2004 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $872,428 $2,632,200 n/a
MA0554 # 02 Y:2004 02 2004 RECOVER WASTE HEAT FROM EQUIPMENT $119,550 $175,000 Not Implemented