IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0678 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,383 $88,700 Implemented
MA0678 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $5,760 Implemented
MA0678 # 03 Y:2011 03 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $9,343 $0 Implemented
MA0678 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,186 $0 Implemented
MA0678 # 05 Y:2011 05 2011 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,819 $26,495 Not Implemented
MA0678 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,833 $8,590 Not Implemented
MA0676 # 01 Y:2011 01 2011 OPTIMIZE PLANT POWER FACTOR $204,367 $98,845 Implemented
MA0676 # 02 Y:2011 02 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $24,027 $4,000 Not Implemented
MA0676 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,019 $500 Not Implemented
MA0676 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $1,721 $2,750 Implemented
MA0676 # 05 Y:2011 05 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $593 $1,250 Implemented
MA0674 # 01 Y:2011 01 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $11,498 $17,900 Not Implemented
MA0674 # 02 Y:2011 02 2011 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,531 $19,965 Not Implemented
MA0674 # 03 Y:2011 03 2011 REDUCE VENTILATION AIR $2,652 $1,200 Not Implemented
MA0674 # 04 Y:2011 04 2011 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,323 $14,500 Not Implemented
MA0674 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $941 $6,225 Not Implemented
MA0674 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $670 $2,150 Not Implemented
MA0674 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $434 $1,400 Not Implemented
MA0675 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,359 $42,800 Not Implemented
MA0675 # 02 Y:2011 02 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $13,761 $66,000 Not Implemented
MA0675 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,132 $23,800 Not Implemented
MA0675 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,736 $23,800 Not Implemented
MA0675 # 05 Y:2011 05 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,422 $23,800 Not Implemented
MA0675 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,677 $12,300 Not Implemented
MA0675 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $2,590 $950 Implemented