IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0532 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $67,039 $7,300 Implemented
MA0532 # 02 Y:2003 02 2003 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $38,956 $84,895 Not Implemented
MA0532 # 03 Y:2003 03 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $3,833 $0 Implemented
MA0532 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,606 $4,400 Implemented
MA0532 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,385 $4,400 Implemented
MA0532 # 06 Y:2003 06 2003 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,627 $1,845 Implemented
MA0532 # 07 Y:2003 07 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,580 $0 Implemented
MA0532 # 08 Y:2003 08 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $520 $0 Not Implemented
MA0530 # 01 Y:2003 01 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $233,841 $25,050 n/a
MA0530 # 02 Y:2003 02 2003 IMPROVE SPACE COMFORT CONDITIONING $56,030 $207,000 n/a
MA0530 # 03 Y:2003 03 2003 CLEAR AND RENT EXISTING SPACE $83,099 $162,400 Not Implemented
MA0530 # 04 Y:2003 04 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $30,234 $30,400 n/a
MA0530 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,046 $9,100 Not Implemented
MA0530 # 06 Y:2003 06 2003 RECOVER WASTE HEAT FROM EQUIPMENT $8,396 $9,900 Not Implemented
MA0530 # 07 Y:2003 07 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,661 $400 Implemented
MA0530 # 08 Y:2003 08 2003 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $8,213 $26,700 Not Implemented
MA0530 # 09 Y:2003 09 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,271 $2,750 Implemented
MA0530 # 10 Y:2003 10 2003 PAY BILLS ON TIME TO AVOID LATE FEES $692 $1,275 Implemented
MA0524 # 01 Y:2002 01 2002 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $31,997 $0 Not Implemented
MA0524 # 02 Y:2002 02 2002 ADOPT IN-HOUSE MATERIAL GENERATION $14,755 $45,000 Not Implemented
MA0524 # 03 Y:2002 03 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,776 $16,000 n/a
MA0524 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,719 $13,000 n/a
MA0524 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,117 $2,000 Implemented
MA0524 # 06 Y:2002 06 2002 INSULATE BARE EQUIPMENT $501 $158 Implemented
MA0524 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $179 $750 Implemented