IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,929

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0476 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,130 $1,000 Implemented
MA0476 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,020 $35,000 Not Implemented
MA0476 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,840 $40,000 Not Implemented
MA0476 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,150 $5,000 Implemented
MA0476 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $7,500 Implemented
MA0476 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,790 $0 Implemented
MA0476 # 10 Y:2000 10 2000 ISOLATE HOT OR COLD EQUIPMENT $2,280 $0 Implemented
MA0476 # 11 Y:2000 11 2000 REPAIR AND ELIMINATE STEAM LEAKS $950 $500 Implemented
MA0475 # 01 Y:2000 01 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,500 $8,500 Not Implemented
MA0475 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $2,450 $5,700 Implemented
MA0475 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $2,000 $2,400 Implemented
MA0475 # 04 Y:2000 04 2000 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $1,950 $0 Implemented
MA0475 # 05 Y:2000 05 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $150 Implemented
MA0475 # 06 Y:2000 06 2000 PAY BILLS ON TIME TO AVOID LATE FEES $519 $0 Implemented
MA0475 # 07 Y:2000 07 2000 INSTALL OCCUPANCY SENSORS $220 $500 Not Implemented
MA0475 # 08 Y:2000 08 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $130 $0 Implemented
MA0474 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,827 $1,000 Implemented
MA0474 # 02 Y:2000 02 2000 INSTALL TIMERS AND/OR THERMOSTATS $4,760 $0 Implemented
MA0474 # 03 Y:2000 03 2000 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $2,838 $13,000 Not Implemented
MA0474 # 04 Y:2000 04 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $746 $4,000 Not Implemented
MA0474 # 05 Y:2000 05 2000 INSTALL OCCUPANCY SENSORS $512 $1,000 Implemented
MA0474 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $371 $100 Implemented
MA0471 # 01 Y:2000 01 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $7,546 $18,500 Not Implemented
MA0471 # 02 Y:2000 02 2000 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $3,105 $11,000 Not Implemented
MA0471 # 03 Y:2000 03 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $2,804 $7,200 Not Implemented