IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MAS021 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $36,978 $9,000 Not Implemented
MAS021 # 03 Y:2012 03 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $18,123 $77,100 Not Implemented
MAS021 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,077 $8,000 Implemented
MAS021 # 05 Y:2012 05 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,883 $3,120 Implemented
MAS021 # 06 Y:2012 06 2012 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,590 $3,120 Implemented
MAS021 # 07 Y:2012 07 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,154 $2,000 Not Implemented
MAS018 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $83,121 $172,430 Not Implemented
MAS018 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,975 $6,000 Not Implemented
MAS018 # 03 Y:2012 03 2012 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $29,548 $92,700 Not Implemented
MAS018 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $19,133 $2,100 Not Implemented
MAS018 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $10,200 $1,775 Not Implemented
MAS018 # 06 Y:2012 06 2012 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,270 $22,500 Not Implemented
MAS018 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,027 $0 Not Implemented
MAS018 # 08 Y:2012 08 2012 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $2,045 $4,600 Not Implemented
MAS018 # 09 Y:2012 09 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $1,767 $0 Not Implemented
MA0686 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,463 $11,880 Not Implemented
MA0686 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,021 $1,800 Implemented
MA0686 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,860 $86,160 Implemented
MA0686 # 02 Y:2012 02 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,626 $19,725 Not Implemented
MA0686 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $5,501 $1,000 Implemented
MA0652 # 01 Y:2009 01 2009 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $11,122 $1,990 Not Implemented
MA0652 # 02 Y:2009 02 2009 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,132 $23,474 Implemented
MA0652 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $7,667 $0 Not Implemented
MA0652 # 04 Y:2009 04 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $3,585 $6,600 Not Implemented
MA0649 # 01 Y:2009 01 2009 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $20,752 $85,000 Not Implemented