Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0613 # 05 Y:2007 | 05 | 2007 | INSULATE BARE EQUIPMENT | $507 | $256 | Implemented |
MA0612 # 11 Y:2007 | 11 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $2,799 | $1,800 | Not Implemented |
MA0612 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $96,635 | $175,500 | Not Implemented |
MA0612 # 02 Y:2007 | 02 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $57,921 | $108,000 | Not Implemented |
MA0612 # 03 Y:2007 | 03 | 2007 | MODERATE COOLING TOWER OUTLET TEMPERATURE | $23,433 | $12,750 | Not Implemented |
MA0612 # 04 Y:2007 | 04 | 2007 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $21,000 | $73,760 | Not Implemented |
MA0612 # 05 Y:2007 | 05 | 2007 | REDUCE VENTILATION AIR | $17,480 | $8,040 | Not Implemented |
MA0612 # 06 Y:2007 | 06 | 2007 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $16,924 | $3,200 | Not Implemented |
MA0612 # 07 Y:2007 | 07 | 2007 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $14,963 | $26,370 | Not Implemented |
MA0612 # 08 Y:2007 | 08 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,240 | $11,700 | Not Implemented |
MA0612 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,610 | $18,700 | Not Implemented |
MA0612 # 10 Y:2007 | 10 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $5,532 | $8,000 | Not Implemented |
MA0611 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $98,826 | $74,772 | Implemented |
MA0611 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,486 | $186,840 | Not Implemented |
MA0611 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $23,954 | $17,587 | Implemented |
MA0611 # 04 Y:2007 | 04 | 2007 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $7,443 | $17,876 | Not Implemented |
MA0611 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM TEMPERATURE | $6,194 | $12,675 | Not Implemented |
MA0611 # 06 Y:2007 | 06 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $3,833 | $5,368 | Implemented |
MA0611 # 07 Y:2007 | 07 | 2007 | INSULATE BARE EQUIPMENT | $3,330 | $3,300 | Implemented |
MA0611 # 08 Y:2007 | 08 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $888 | $6,305 | Not Implemented |
MA0611 # 09 Y:2007 | 09 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $504 | $3,600 | Not Implemented |
MA0610 # 01 Y:2007 | 01 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,053 | $49,555 | Not Implemented |
MA0610 # 02 Y:2007 | 02 | 2007 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $5,760 | $7,600 | Implemented |
MA0610 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,399 | $10,600 | Implemented |
MA0610 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,743 | $4,700 | Implemented |