IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,692

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0838 # 04 Y:2022 04 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,501 $500 Implemented
MA0838 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,687 $6,969 Implemented
MA0838 # 06 Y:2022 06 2022 TURN OFF EQUIPMENT WHEN NOT IN USE $1,706 $250 Implemented
MA0835 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $10,572 $40,722 Implemented
MA0835 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,773 $7,150 Implemented
MA0835 # 03 Y:2022 03 2022 RECOVER WASTE HEAT FROM EQUIPMENT $18,072 $14,280 Not Implemented
MA0835 # 04 Y:2022 04 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $680 $750 Implemented
MA0835 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,360 $625 Not Implemented
MA0836 # 01 Y:2022 01 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $16,115 $39,510 Not Implemented
MA0836 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $9,598 $34,642 Not Implemented
MA0836 # 03 Y:2022 03 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $9,895 $23,950 Implemented
MA0836 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,264 $875 Not Implemented
MA0836 # 05 Y:2022 05 2022 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,531 $1,500 Implemented
MA0836 # 06 Y:2022 06 2022 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE $7,372 $500 Implemented
MA0836 # 07 Y:2022 07 2022 USE HEAT PUMP FOR SPACE CONDITIONING $2,777 $7,150 Implemented
MA0836 # 08 Y:2022 08 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,781 $625 Implemented
MA0834 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $88,978 $607,766 Not Implemented
MA0834 # 02 Y:2022 02 2022 USE HEAT PUMP FOR SPACE CONDITIONING $4,705 $2,150 Not Implemented
MA0834 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,172 $5,632 Not Implemented
MA0834 # 04 Y:2022 04 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $263 $900 Not Implemented
MA0837 # 01 Y:2022 01 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,524 $1,250 Implemented
MA0837 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,317 $2,500 Implemented
MA0837 # 03 Y:2022 03 2022 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $10,507 $46,265 Not Implemented
MA0837 # 04 Y:2022 04 2022 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,956 $500 Implemented
MA0837 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,463 $625 Implemented