Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0619 # 02 Y:2007 | 02 | 2007 | PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST | $93,033 | $350,000 | Not Implemented |
MA0619 # 03 Y:2007 | 03 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $42,349 | $10,800 | Implemented |
MA0619 # 04 Y:2007 | 04 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $15,153 | $5,154 | Not Implemented |
MA0619 # 05 Y:2007 | 05 | 2007 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,883 | $5,300 | Not Implemented |
MA0619 # 06 Y:2007 | 06 | 2007 | REDUCE VENTILATION AIR | $14,409 | $11,500 | Implemented |
MA0619 # 07 Y:2007 | 07 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,715 | $19,440 | Implemented |
MA0619 # 08 Y:2007 | 08 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,151 | $7,151 | Not Implemented |
MA0619 # 09 Y:2007 | 09 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,560 | $1,184 | Implemented |
MA0600 # 01 Y:2006 | 01 | 2006 | USE UTILITY CONTROLLED POWER MANAGEMENT | $24,000 | $0 | Not Implemented |
MA0600 # 02 Y:2006 | 02 | 2006 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $8,271 | $12,700 | Not Implemented |
MA0600 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,209 | $17,438 | Not Implemented |
MA0600 # 04 Y:2006 | 04 | 2006 | OPTIMIZE PLANT POWER FACTOR | $5,321 | $10,000 | Not Implemented |
MA0600 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $1,683 | $2,000 | Not Implemented |
MA0600 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,507 | $5,000 | Not Implemented |
MA0598 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $25,324 | $45,333 | Not Implemented |
MA0598 # 02 Y:2006 | 02 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $19,748 | $1,125 | Implemented |
MA0598 # 03 Y:2006 | 03 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,315 | $18,065 | Implemented |
MA0598 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $4,500 | $4,314 | Implemented |
MA0598 # 05 Y:2006 | 05 | 2006 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,571 | $3,000 | Not Implemented |
MA0598 # 06 Y:2006 | 06 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $716 | $500 | Not Implemented |
MA0598 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $405 | $300 | Implemented |
MA0582 # 01 Y:2005 | 01 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $98,511 | $312,103 | Not Implemented |
MA0582 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,163 | $86,315 | Implemented |
MA0582 # 03 Y:2005 | 03 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $15,630 | $6,540 | Implemented |
MA0582 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $14,153 | $0 | Implemented |