Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0541 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $14,763 | $14,000 | Not Implemented |
MA0541 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,264 | $5,500 | Implemented |
MA0541 # 05 Y:2003 | 05 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,600 | $22,000 | n/a |
MA0541 # 06 Y:2003 | 06 | 2003 | USE MINIMUM STEAM OPERATING PRESSURE | $5,023 | $5,000 | Implemented |
MA0541 # 07 Y:2003 | 07 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,751 | $0 | Not Implemented |
MA0541 # 08 Y:2003 | 08 | 2003 | INSULATE BARE EQUIPMENT | $635 | $260 | Implemented |
MA0541 # 09 Y:2003 | 09 | 2003 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $523 | $72 | Not Implemented |
MA0540 # 01 Y:2003 | 01 | 2003 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $1,726,195 | $11,884,320 | Not Implemented |
MA0540 # 02 Y:2003 | 02 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,349 | $28,595 | Not Implemented |
MA0540 # 03 Y:2003 | 03 | 2003 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $32,261 | $17,920 | Not Implemented |
MA0540 # 04 Y:2003 | 04 | 2003 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,447 | $7,000 | Not Implemented |
MA0540 # 05 Y:2003 | 05 | 2003 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $10,042 | $6,200 | Not Implemented |
MA0540 # 06 Y:2003 | 06 | 2003 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $295,995 | $436,450 | Not Implemented |
MA0540 # 07 Y:2003 | 07 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,220 | $650 | Not Implemented |
MA0540 # 08 Y:2003 | 08 | 2003 | DEVELOP A REPAIR/REPLACE POLICY | $3,581 | $5,497 | Not Implemented |
MA0540 # 09 Y:2003 | 09 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,968 | $15,662 | Implemented |
MA0539 # 01 Y:2003 | 01 | 2003 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,787 | $12,870 | Not Implemented |
MA0539 # 02 Y:2003 | 02 | 2003 | INSTALL TIMERS AND/OR THERMOSTATS | $5,957 | $650 | Implemented |
MA0539 # 03 Y:2003 | 03 | 2003 | REDUCE VENTILATION AIR | $301 | $800 | Implemented |
MA0539 # 04 Y:2003 | 04 | 2003 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $183 | $0 | Implemented |
MA0539 # 05 Y:2003 | 05 | 2003 | INSULATE BARE EQUIPMENT | $63 | $93 | Not Implemented |
MA0538 # 01 Y:2003 | 01 | 2003 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $141,119 | $1,825,320 | Not Implemented |
MA0538 # 02 Y:2003 | 02 | 2003 | IMPROVE COMBUSTION CONTROL CAPABILITY | $33,322 | $76,300 | Not Implemented |
MA0538 # 03 Y:2003 | 03 | 2003 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $31,418 | $1,200 | Implemented |
MA0538 # 04 Y:2003 | 04 | 2003 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,650 | $60,800 | Implemented |