IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

240

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0787 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $660 $100 Implemented
MA0787 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,111 $100 Implemented
MA0787 # 03 Y:2018 03 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $4,796 $100 Implemented
MA0787 # 02 Y:2018 02 2018 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,589 $100 Implemented
MA0787 # 01 Y:2018 01 2018 USE SOLAR HEAT FOR HEAT $76,722 $790,840 Not Implemented
MA0748 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $721 $2,245 Implemented
MA0748 # 06 Y:2015 06 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,168 $500 Implemented
MA0748 # 05 Y:2015 05 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $1,137 $100 Implemented
MA0748 # 04 Y:2015 04 2015 INSTALL OCCUPANCY SENSORS $1,687 $5,365 Implemented
MA0748 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,530 $9,000 Not Implemented
MA0748 # 02 Y:2015 02 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,716 $9,850 Not Implemented
MA0748 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $35,959 $11,580 Not Implemented
MA0746 # 01 Y:2015 01 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $14,457 $7,354 Implemented
MA0746 # 02 Y:2015 02 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,017 $88,800 Implemented
MA0746 # 03 Y:2015 03 2015 REDUCE VENTILATION AIR $13,483 $3,785 Implemented
MA0746 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,070 $2,100 Implemented
MA0746 # 05 Y:2015 05 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,299 $3,000 Implemented
MA0746 # 06 Y:2015 06 2015 REPAIR OR REPLACE STEAM TRAPS $2,323 $362 Implemented
MA0746 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,874 $2,960 Implemented
MA0728 # 02 Y:2014 02 2014 REPLACE BOILER $10,114 $30,450 Implemented
MA0728 # 03 Y:2014 03 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,940 $6,500 Implemented
MA0728 # 04 Y:2014 04 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $324 $350 Not Implemented
MA0728 # 01 Y:2014 01 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $16,512 $25,775 Implemented
MA0726 # 04 Y:2014 04 2014 INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION $608 $500 Implemented
MA0726 # 01 Y:2014 01 2014 INSTALL FOSSIL FUEL MAKE-UP AIR UNIT $25,418 $110,000 Not Implemented