Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
240
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0787 # 05 Y:2018 | 05 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $660 | $100 | Implemented |
MA0787 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,111 | $100 | Implemented |
MA0787 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $4,796 | $100 | Implemented |
MA0787 # 02 Y:2018 | 02 | 2018 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $6,589 | $100 | Implemented |
MA0787 # 01 Y:2018 | 01 | 2018 | USE SOLAR HEAT FOR HEAT | $76,722 | $790,840 | Not Implemented |
MA0748 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $721 | $2,245 | Implemented |
MA0748 # 06 Y:2015 | 06 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,168 | $500 | Implemented |
MA0748 # 05 Y:2015 | 05 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,137 | $100 | Implemented |
MA0748 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $1,687 | $5,365 | Implemented |
MA0748 # 03 Y:2015 | 03 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,530 | $9,000 | Not Implemented |
MA0748 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $9,716 | $9,850 | Not Implemented |
MA0748 # 01 Y:2015 | 01 | 2015 | INSULATE BARE EQUIPMENT | $35,959 | $11,580 | Not Implemented |
MA0746 # 01 Y:2015 | 01 | 2015 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,457 | $7,354 | Implemented |
MA0746 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $14,017 | $88,800 | Implemented |
MA0746 # 03 Y:2015 | 03 | 2015 | REDUCE VENTILATION AIR | $13,483 | $3,785 | Implemented |
MA0746 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,070 | $2,100 | Implemented |
MA0746 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,299 | $3,000 | Implemented |
MA0746 # 06 Y:2015 | 06 | 2015 | REPAIR OR REPLACE STEAM TRAPS | $2,323 | $362 | Implemented |
MA0746 # 07 Y:2015 | 07 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,874 | $2,960 | Implemented |
MA0728 # 02 Y:2014 | 02 | 2014 | REPLACE BOILER | $10,114 | $30,450 | Implemented |
MA0728 # 03 Y:2014 | 03 | 2014 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,940 | $6,500 | Implemented |
MA0728 # 04 Y:2014 | 04 | 2014 | INSTALL / REPAIR INSULATION ON STEAM LINES | $324 | $350 | Not Implemented |
MA0728 # 01 Y:2014 | 01 | 2014 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $16,512 | $25,775 | Implemented |
MA0726 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $608 | $500 | Implemented |
MA0726 # 01 Y:2014 | 01 | 2014 | INSTALL FOSSIL FUEL MAKE-UP AIR UNIT | $25,418 | $110,000 | Not Implemented |