IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

219

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0350 # 04 Y:1995 04 1995 INSULATE BARE EQUIPMENT $1,806 $870 Implemented
MA0350 # 02 Y:1995 02 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $15,250 $28,000 Not Implemented
MA0350 # 07 Y:1995 07 1995 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $1,050 $400 Not Implemented
MA0350 # 03 Y:1995 03 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,705 $630 Not Implemented
MA0350 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,260 $500 Implemented
MA0350 # 01 Y:1995 01 1995 INSTALL SET-BACK TIMERS $18,981 $7,000 Implemented
MA0350 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,118 $2,813 Not Implemented
MA0349 # 02 Y:1995 02 1995 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $25,737 $27,186 Not Implemented
MA0349 # 04 Y:1995 04 1995 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $777 $2,600 Not Implemented
MA0349 # 01 Y:1995 01 1995 INSULATE BARE EQUIPMENT $47,119 $20,700 Implemented
MA0349 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $571 $127 Not Implemented
MA0349 # 03 Y:1995 03 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $858 $1,700 Implemented
MA0348 # 06 Y:1995 06 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $1,710 $385 Not Implemented
MA0348 # 04 Y:1995 04 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,014 $1,200 Implemented
MA0348 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $852 $127 Implemented
MA0348 # 02 Y:1995 02 1995 USE SYNTHETIC LUBRICANT $852 $300 Not Implemented
MA0348 # 03 Y:1995 03 1995 INSTALL OCCUPANCY SENSORS $642 $350 Not Implemented
MA0348 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,011 $4,750 Implemented
MA0347 # 01 Y:1995 01 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,329 $20,441 Not Implemented
MA0347 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $364 $80 Not Implemented
MA0347 # 06 Y:1995 06 1995 FILTER AND REUSE HYDRAULIC OIL $29,912 $51,750 Implemented
MA0347 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,154 $8,175 Implemented
MA0347 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $319 $900 Not Implemented
MA0347 # 02 Y:1995 02 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,019 $1,750 Not Implemented
MA0347 # 07 Y:1995 07 1995 SHIP HYDRAULIC OIL TO SECONDARY FUEL PROGRAM $1,000 $0 Not Implemented