Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
155
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0423 # 03 Y:1998 | 03 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,343 | $234 | Implemented |
MA0423 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $585 | $2,627 | Implemented |
MA0423 # 01 Y:1998 | 01 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,806 | $300 | Implemented |
MA0423 # 06 Y:1998 | 06 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $187 | $294 | Not Implemented |
MA0423 # 04 Y:1998 | 04 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,279 | $80,000 | Not Implemented |
MA0423 # 07 Y:1998 | 07 | 1998 | INSTALL OCCUPANCY SENSORS | $149 | $257 | Not Implemented |
MA0423 # 02 Y:1998 | 02 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,841 | $2,700 | Implemented |
MA0428 # 04 Y:1998 | 04 | 1998 | IMPROVE SPACE COMFORT CONDITIONING | $5,656 | $11,874 | Not Implemented |
MA0428 # 05 Y:1998 | 05 | 1998 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,618 | $29,750 | Not Implemented |
MA0428 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,142 | $980 | Implemented |
MA0428 # 02 Y:1998 | 02 | 1998 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $642 | $30 | Implemented |
MA0428 # 01 Y:1998 | 01 | 1998 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,280 | $2,110 | Not Implemented |
MA0422 # 01 Y:1998 | 01 | 1998 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $20,664 | $120,000 | Not Implemented |
MA0422 # 06 Y:1998 | 06 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $236 | $776 | Implemented |
MA0422 # 05 Y:1998 | 05 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $337 | $346 | Implemented |
MA0422 # 03 Y:1998 | 03 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $764 | $0 | Implemented |
MA0422 # 02 Y:1998 | 02 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,889 | $3,625 | Not Implemented |
MA0422 # 04 Y:1998 | 04 | 1998 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $452 | $1,270 | Implemented |
MA0430 # 04 Y:1998 | 04 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,777 | $10,080 | Not Implemented |
MA0430 # 07 Y:1998 | 07 | 1998 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,518 | $800 | Implemented |
MA0430 # 06 Y:1998 | 06 | 1998 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $56,116 | $21,247 | Not Implemented |
MA0430 # 03 Y:1998 | 03 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $711 | $1,840 | Implemented |
MA0430 # 01 Y:1998 | 01 | 1998 | USE OPTIMUM TEMPERATURE | $5,357 | $300 | Implemented |
MA0430 # 02 Y:1998 | 02 | 1998 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,264 | $0 | Not Implemented |
MA0430 # 09 Y:1998 | 09 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,863 | $15,850 | Not Implemented |