IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

155

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0423 # 03 Y:1998 03 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,343 $234 Implemented
MA0423 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $585 $2,627 Implemented
MA0423 # 01 Y:1998 01 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,806 $300 Implemented
MA0423 # 06 Y:1998 06 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $187 $294 Not Implemented
MA0423 # 04 Y:1998 04 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,279 $80,000 Not Implemented
MA0423 # 07 Y:1998 07 1998 INSTALL OCCUPANCY SENSORS $149 $257 Not Implemented
MA0423 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,841 $2,700 Implemented
MA0428 # 04 Y:1998 04 1998 $5,656 $11,874 Not Implemented
MA0428 # 05 Y:1998 05 1998 $5,618 $29,750 Not Implemented
MA0428 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $3,142 $980 Implemented
MA0428 # 02 Y:1998 02 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $642 $30 Implemented
MA0428 # 01 Y:1998 01 1998 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,280 $2,110 Not Implemented
MA0422 # 01 Y:1998 01 1998 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,664 $120,000 Not Implemented
MA0422 # 06 Y:1998 06 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $776 Implemented
MA0422 # 05 Y:1998 05 1998 RECOVER WASTE HEAT FROM EQUIPMENT $337 $346 Implemented
MA0422 # 03 Y:1998 03 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $764 $0 Implemented
MA0422 # 02 Y:1998 02 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,889 $3,625 Not Implemented
MA0422 # 04 Y:1998 04 1998 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $452 $1,270 Implemented
MA0430 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,777 $10,080 Not Implemented
MA0430 # 07 Y:1998 07 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $2,518 $800 Implemented
MA0430 # 06 Y:1998 06 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $56,116 $21,247 Not Implemented
MA0430 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $711 $1,840 Implemented
MA0430 # 01 Y:1998 01 1998 USE OPTIMUM TEMPERATURE $5,357 $300 Implemented
MA0430 # 02 Y:1998 02 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,264 $0 Not Implemented
MA0430 # 09 Y:1998 09 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,863 $15,850 Not Implemented