Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
136
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0626 # 03 Y:2007 | 03 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $5,346 | $0 | Not Implemented |
MA0626 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,602 | $5,481 | Not Implemented |
MA0626 # 04 Y:2007 | 04 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $3,465 | $2,500 | Not Implemented |
MA0626 # 01 Y:2007 | 01 | 2007 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $67,278 | $157,500 | Not Implemented |
MA0626 # 06 Y:2007 | 06 | 2007 | AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED | $395 | $200 | Not Implemented |
MA0626 # 02 Y:2007 | 02 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $6,543 | $8,000 | Not Implemented |
MA0625 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,964 | $10,530 | Implemented |
MA0625 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,881 | $0 | Not Implemented |
MA0625 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,861 | $14,400 | Not Implemented |
MA0625 # 02 Y:2007 | 02 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,935 | $8,000 | Implemented |
MA0625 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,463 | $31,000 | Not Implemented |
MA0624 # 03 Y:2007 | 03 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $24,012 | $50,000 | Implemented |
MA0624 # 10 Y:2007 | 10 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,007 | $12,000 | Implemented |
MA0624 # 01 Y:2007 | 01 | 2007 | REPAIR OR REPLACE STEAM TRAPS | $62,300 | $24,500 | Implemented |
MA0624 # 12 Y:2007 | 12 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,045 | $5,670 | Implemented |
MA0624 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,570 | $15,700 | Not Implemented |
MA0624 # 09 Y:2007 | 09 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $4,605 | $1,000 | Not Implemented |
MA0624 # 04 Y:2007 | 04 | 2007 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $14,298 | $11,500 | Implemented |
MA0624 # 06 Y:2007 | 06 | 2007 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $11,448 | $2,500 | Implemented |
MA0624 # 05 Y:2007 | 05 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $12,255 | $75,000 | Implemented |
MA0624 # 02 Y:2007 | 02 | 2007 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $47,607 | $22,000 | Not Implemented |
MA0624 # 08 Y:2007 | 08 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,655 | $4,000 | Implemented |
MA0624 # 07 Y:2007 | 07 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,741 | $0 | Implemented |
MA0622 # 04 Y:2007 | 04 | 2007 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $337,840 | $694,400 | Implemented |
MA0622 # 07 Y:2007 | 07 | 2007 | INSTALL / REPAIR INSULATION ON STEAM LINES | $21,165 | $10,000 | Implemented |