IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

84

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0785 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,469 $2,569 Not Implemented
MA0785 # 01 Y:2017 01 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,893 $20,000 Implemented
MA0785 # 04 Y:2017 04 2017 INSULATE BARE EQUIPMENT $695 $959 Not Implemented
MA0785 # 03 Y:2017 03 2017 KEEP BOILER TUBES CLEAN $1,014 $1,200 Implemented
MA0784 # 07 Y:2017 07 2017 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $2,491 $500 Not Implemented
MA0784 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,498 $18,391 Implemented
MA0784 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,884 $24,000 Not Implemented
MA0784 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,360 $16,650 Not Implemented
MA0784 # 01 Y:2017 01 2017 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $64,908 $71,450 Implemented
MA0784 # 06 Y:2017 06 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,233 $16,685 Not Implemented
MA0784 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,530 $41,013 Implemented
MA0783 # 02 Y:2017 02 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,697 $19,975 Not Implemented
MA0783 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $17,909 $431,094 Not Implemented
MA0783 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,297 $14,420 Implemented
MA0783 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $2,760 Implemented
MA0782 # 05 Y:2017 05 2017 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $160 $100 Not Implemented
MA0782 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,638 $1,583 Implemented
MA0782 # 04 Y:2017 04 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $277 $100 Implemented
MA0782 # 03 Y:2017 03 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,366 $600 Implemented
MA0782 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,221 $78,750 Not Implemented
MA0780 # 03 Y:2017 03 2017 USE OPTIMUM THICKNESS INSULATION $575 $865 Not Implemented
MA0780 # 02 Y:2017 02 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $583 $100 Not Implemented
MA0780 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $66,074 $629,413 Not Implemented
MA0781 # 01 Y:2017 01 2017 USE SOLAR HEAT FOR HEAT $33,144 $405,711 Not Implemented
MA0781 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $7,386 $6,000 Not Implemented