IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

833

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0261 # 06 Y:1999 06 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,704 $12,000 Implemented
ME0261 # 07 Y:1999 07 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $4,394 $3,080 Implemented
ME0261 # 08 Y:1999 08 1999 INSULATE BARE EQUIPMENT $1,053 $1,200 Implemented
ME0261 # 09 Y:1999 09 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $886 $200 Implemented
ME0261 # 10 Y:1999 10 1999 MINIMIZE WATER USAGE $788 $500 Implemented
ME0261 # 11 Y:1999 11 1999 DEVELOP A REPAIR/REPLACE POLICY $271 $325 Implemented
ME0261 # 12 Y:1999 12 1999 $29 $27 Implemented
ME0260 # 04 Y:1999 04 1999 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $585 $171 Implemented
ME0259 # 01 Y:1999 01 1999 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $7,332 $5,655 Implemented
ME0259 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,027 $9,340 Implemented
ME0259 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $0 Implemented
ME0259 # 04 Y:1999 04 1999 COMBINE UTILITY METERS $456 $230 Implemented
ME0259 # 05 Y:1999 05 1999 COMBINE UTILITY METERS $450 $720 Implemented
ME0259 # 07 Y:1999 07 1999 RECOVER WASTE HEAT FROM EQUIPMENT $365 $400 Implemented
ME0259 # 08 Y:1999 08 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $285 $215 Implemented
ME0259 # 09 Y:1999 09 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $14,100 $955,000 Implemented
ME0259 # 11 Y:1999 11 1999 USE WATER-BASED CUTTING FLUIDS TO ELIMINATE NEED FOR SOLVENT CLEANING $917 $0 Implemented
ME0234 # 10 Y:1998 10 1998 UTILIZE A CENTRAL COOLANT SYSTEM FOR CLEANING AND REUSE OF METAL WORKING FLUID $1,114 $7,000 Implemented
ME0234 # 07 Y:1998 07 1998 RECOVER AND REUSE COOLING WATER $12,512 $12,000 Implemented
ME0234 # 06 Y:1998 06 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $975 $500 Implemented
ME0234 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,284 $800 Implemented
ME0234 # 04 Y:1998 04 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,482 $4,476 Implemented
ME0234 # 03 Y:1998 03 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,153 $10,580 Implemented
ME0234 # 02 Y:1998 02 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $19,979 $12,932 Implemented
ME0234 # 01 Y:1998 01 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $38,400 $50,000 Implemented