IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

833

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0252 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,186 $28,000 Implemented
ME0252 # 03 Y:1998 03 1998 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,928 $2,675 Implemented
ME0252 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,171 $1,923 Implemented
ME0252 # 06 Y:1998 06 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,309 $1,457 Implemented
ME0252 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,213 $1,405 Implemented
ME0252 # 08 Y:1998 08 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $466 $225 Implemented
ME0252 # 09 Y:1998 09 1998 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $233 $375 Implemented
ME0252 # 10 Y:1998 10 1998 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $89,700 $11,750 Implemented
ME0251 # 01 Y:1998 01 1998 INSULATE BARE EQUIPMENT $2,487 $600 Implemented
ME0251 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,240 $2,100 Implemented
ME0251 # 04 Y:1998 04 1998 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $1,020 $400 Implemented
ME0251 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $448 $0 Implemented
ME0251 # 06 Y:1998 06 1998 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $160,875 $31,200 Implemented
ME0246 # 02 Y:1998 02 1998 USE OPTIMUM TEMPERATURE $7,462 $0 Implemented
ME0246 # 03 Y:1998 03 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,928 $0 Implemented
ME0246 # 04 Y:1998 04 1998 INSULATE BARE EQUIPMENT $5,134 $10,930 Implemented
ME0246 # 05 Y:1998 05 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,568 $0 Implemented
ME0246 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $18,894 $43,500 Implemented
ME0245 # 01 Y:1998 01 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,696 $0 Implemented
ME0245 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,163 $5,970 Implemented
ME0245 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,398 $400 Implemented
ME0245 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,127 $3,000 Implemented
ME0245 # 05 Y:1998 05 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,051 $2,000 Implemented
ME0245 # 06 Y:1998 06 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $895 $700 Implemented
ME0245 # 07 Y:1998 07 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $900 Implemented