Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,924
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0451 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,231 | $100 | Implemented |
MI0451 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $4,130 | $4,044 | Implemented |
MI0451 # 02 Y:2024 | 02 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,582 | $40 | Implemented |
MI0451 # 07 Y:2024 | 07 | 2024 | INSULATE BARE EQUIPMENT | $529 | $949 | Implemented |
MI0451 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,862 | $16,333 | Implemented |
MI0451 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,513 | $1,755 | Implemented |
MI0448 # 03 Y:2024 | 03 | 2024 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,793 | $0 | Implemented |
MI0448 # 06 Y:2024 | 06 | 2024 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,321 | $911 | Implemented |
MI0448 # 02 Y:2024 | 02 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,135 | $200 | Implemented |
MI0448 # 01 Y:2024 | 01 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,947 | $700 | Implemented |
MI0448 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,923 | $4,108 | Implemented |
MI0447 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,522 | $700 | Implemented |
MI0447 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,899 | $1,980 | Implemented |
MI0447 # 06 Y:2024 | 06 | 2024 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $792 | $320 | Implemented |
MI0447 # 05 Y:2024 | 05 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,840 | $3,750 | Implemented |
MI0447 # 01 Y:2024 | 01 | 2024 | UPGRADE OBSOLETE EQUIPMENT | $636,028 | $600,000 | Implemented |
MI0445 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $46,588 | $99,444 | Implemented |
MI0445 # 07 Y:2024 | 07 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,583 | $5,793 | Implemented |
MI0445 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $32,574 | $11,027 | Implemented |
MI0445 # 08 Y:2024 | 08 | 2024 | INSTALL OCCUPANCY SENSORS | $3,269 | $2,860 | Implemented |
MI0445 # 03 Y:2024 | 03 | 2024 | PAY UTILITY BILLS ON TIME | $80,165 | $0 | Implemented |
MI0445 # 06 Y:2024 | 06 | 2024 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $19,584 | $150 | Implemented |
MI0445 # 01 Y:2024 | 01 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $427,475 | $602,500 | Implemented |
MI0444 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,757 | $1,980 | Implemented |
MI0444 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,226 | $1,016 | Implemented |