IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

346

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0437 # 05 Y:2023 05 2023 INSTALL OCCUPANCY SENSORS $441 $433 Implemented
MI0437 # 02 Y:2023 02 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $127,058 $120 Implemented
MI0431 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $816 $1,400 Implemented
MI0431 # 06 Y:2023 06 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,030 $80 Implemented
MI0431 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,269 $1,020 Implemented
MI0431 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $8,323 $680 Implemented
MI0431 # 03 Y:2023 03 2023 OPTIMIZE PLANT POWER FACTOR $8,963 $16,003 Implemented
MI0427 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,053 $1,060 Implemented
MI0427 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,069 $4,697 Implemented
MI0427 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,803 $791 Implemented
MI0419 # 02 Y:2023 02 2023 STORE HEATED/ COOLED WATER FOR USE DURING PEAK DEMAND PERIODS $19,853 $37,026 Implemented
MI0419 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $28,061 $1,060 Implemented
MI0419 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,550 $2,325 Implemented
MI0419 # 03 Y:2023 03 2023 PAY UTILITY BILLS ON TIME $15,232 $0 Implemented
MI0418 # 05 Y:2023 05 2023 PAY UTILITY BILLS ON TIME $325 $0 Implemented
MI0418 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,109 $910 Implemented
MI0418 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,311 $1,060 Implemented
MI0415 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,767 $960 Implemented
MI0406 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $5,579 $15,821 Implemented
MI0406 # 04 Y:2022 04 2022 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,468 $15,450 Implemented
MI0406 # 06 Y:2022 06 2022 ELIMINATE/REDUCE AN OPERATION $4,770 $960 Implemented
MI0406 # 03 Y:2022 03 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,550 $2,031 Implemented
MI0406 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,075 $5,674 Implemented
MI0406 # 01 Y:2022 01 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,298 $45,090 Implemented
MI0403 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,275 $5,780 Implemented