Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
210
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0266 # 01 Y:2014 | 01 | 2014 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $12,844 | $14,320 | Not Implemented |
MI0265 # 20 Y:2014 | 20 | 2014 | INSULATE BARE EQUIPMENT | $82 | $92 | Not Implemented |
MI0265 # 01 Y:2014 | 01 | 2014 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $27,195 | $1,120 | Not Implemented |
MI0265 # 02 Y:2014 | 02 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $28,983 | $9,620 | Implemented |
MI0265 # 03 Y:2014 | 03 | 2014 | USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES | $24,961 | $480 | Implemented |
MI0265 # 04 Y:2014 | 04 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,870 | $12,900 | Not Implemented |
MI0265 # 05 Y:2014 | 05 | 2014 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $24,844 | $820 | Implemented |
MI0265 # 06 Y:2014 | 06 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $20,044 | $640 | Implemented |
MI0265 # 07 Y:2014 | 07 | 2014 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $16,496 | $160 | Implemented |
MI0265 # 08 Y:2014 | 08 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,171 | $9,500 | Not Implemented |
MI0265 # 09 Y:2014 | 09 | 2014 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $8,527 | $17,000 | Implemented |
MI0265 # 10 Y:2014 | 10 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,636 | $7,480 | Not Implemented |
MI0265 # 12 Y:2014 | 12 | 2014 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,968 | $3,309 | Implemented |
MI0265 # 11 Y:2014 | 11 | 2014 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $5,236 | $320 | Not Implemented |
MI0265 # 19 Y:2014 | 19 | 2014 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $1,375 | $347 | Implemented |
MI0265 # 18 Y:2014 | 18 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,758 | $80 | Implemented |
MI0265 # 17 Y:2014 | 17 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $1,975 | $140 | Not Implemented |
MI0265 # 15 Y:2014 | 15 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,303 | $1,260 | Not Implemented |
MI0265 # 14 Y:2014 | 14 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,624 | $2,320 | Not Implemented |
MI0265 # 13 Y:2014 | 13 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,304 | $5,640 | Not Implemented |
MI0265 # 16 Y:2014 | 16 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,306 | $10,640 | Implemented |
MI0264 # 07 Y:2014 | 07 | 2014 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $7,073 | $1,000 | Implemented |
MI0264 # 08 Y:2014 | 08 | 2014 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $5,408 | $140 | Implemented |
MI0264 # 09 Y:2014 | 09 | 2014 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,031 | $140 | Not Implemented |
MI0264 # 11 Y:2014 | 11 | 2014 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $2,707 | $3,170 | Not Implemented |