IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

111

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0213 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $747 $900 Implemented
MI0213 # 07 Y:2011 07 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,260 $2,830 Not Implemented
MI0213 # 06 Y:2011 06 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,430 $1,860 Implemented
MI0213 # 05 Y:2011 05 2011 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,255 $350 Not Implemented
MI0213 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,184 $1,320 Not Implemented
MI0213 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,899 $4,000 Not Implemented
MI0213 # 02 Y:2011 02 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,640 $1,300 Implemented
MI0213 # 01 Y:2011 01 2011 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $5,935 $14,200 Not Implemented
MI0212 # 01 Y:2011 01 2011 UTILIZE A LESS EXPENSIVE COOLING METHOD $22,567 $75,000 Not Implemented
MI0212 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,602 $9,200 Not Implemented
MI0212 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,091 $2,600 Not Implemented
MI0212 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,896 $6,665 Not Implemented
MI0212 # 06 Y:2011 06 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $1,802 $1,300 Not Implemented
MI0212 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $984 $1,993 Not Implemented
MI0212 # 08 Y:2011 08 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $501 $50 Not Implemented
MI0212 # 05 Y:2011 05 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,074 $4,800 Not Implemented
MI0211 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,111 $1,320 Implemented
MI0211 # 01 Y:2011 01 2011 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $25,532 $213,119 Implemented
MI0211 # 02 Y:2011 02 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,191 $41,400 Implemented
MI0211 # 03 Y:2011 03 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,390 $25,000 Not Implemented
MI0211 # 05 Y:2011 05 2011 HEAT WATER WITH EXHAUST HEAT $16,479 $30,000 Not Implemented
MI0211 # 07 Y:2011 07 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,618 $50 Implemented
MI0211 # 06 Y:2011 06 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,771 $1,950 Implemented
MI0211 # 09 Y:2011 09 2011 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,438 $4,571 Implemented
MI0211 # 08 Y:2011 08 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,475 $1,720 Not Implemented