Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
117
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0343 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $30,500 | $3,280 | Implemented |
MI0343 # 01 Y:2018 | 01 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $236,442 | $800,000 | Implemented |
MI0343 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $16,044 | $2,973 | Not Implemented |
MI0343 # 05 Y:2018 | 05 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $17,400 | $71,328 | Implemented |
MI0343 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32,079 | $2,030 | Implemented |
MI0343 # 08 Y:2018 | 08 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,552 | $7,675 | Implemented |
MI0343 # 09 Y:2018 | 09 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,896 | $6,486 | Implemented |
MI0343 # 07 Y:2018 | 07 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,421 | $1,005 | Not Implemented |
MI0343 # 02 Y:2018 | 02 | 2018 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $37,140 | $43,838 | Not Implemented |
MI0337 # 04 Y:2018 | 04 | 2018 | INSULATE BARE EQUIPMENT | $26,104 | $3,000 | Implemented |
MI0337 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $45,349 | $76,979 | Implemented |
MI0337 # 08 Y:2018 | 08 | 2018 | INSTALL OCCUPANCY SENSORS | $14,515 | $19,215 | Implemented |
MI0337 # 05 Y:2018 | 05 | 2018 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,458 | $31,600 | Not Implemented |
MI0337 # 11 Y:2018 | 11 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,571 | $6,578 | Implemented |
MI0337 # 06 Y:2018 | 06 | 2018 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $21,780 | $78,320 | Not Implemented |
MI0337 # 09 Y:2018 | 09 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,557 | $2,528 | Not Implemented |
MI0337 # 02 Y:2018 | 02 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $41,184 | $480 | Implemented |
MI0337 # 10 Y:2018 | 10 | 2018 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $3,724 | $7,314 | Implemented |
MI0337 # 07 Y:2018 | 07 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,813 | $2,030 | Implemented |
MI0337 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,197 | $11,846 | Not Implemented |
MI0336 # 08 Y:2018 | 08 | 2018 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,516 | $661 | Not Implemented |
MI0336 # 03 Y:2018 | 03 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $17,738 | $3,280 | Implemented |
MI0336 # 01 Y:2018 | 01 | 2018 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $21,620 | $80 | Implemented |
MI0336 # 05 Y:2018 | 05 | 2018 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $4,515 | $626 | Not Implemented |
MI0336 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,664 | $11,634 | Implemented |