Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0257 # 08 Y:1999 08 1999 UTILIZE OUTSIDE CONTRACTING $11,880 $0 Not Implemented
MO0256 # 01 Y:1999 01 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,574 $10,069 Implemented
MO0256 # 02 Y:1999 02 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,533 $3,290 Implemented
MO0256 # 03 Y:1999 03 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $488 $60 Not Implemented
MO0256 # 04 Y:1999 04 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $437 $0 Not Implemented
MO0256 # 05 Y:1999 05 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $400 $0 Not Implemented
MO0256 # 06 Y:1999 06 1999 CONDENSE OPERATION INTO ONE BUILDING $250,000 $125,000 Not Implemented
MO0256 # 07 Y:1999 07 1999 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $5,216 $0 Not Implemented
MO0256 # 08 Y:1999 08 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $2,520 $3,700 Implemented
MO0256 # 09 Y:1999 09 1999 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $1,463 $0 Not Implemented
MO0253 # 01 Y:1999 01 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,142 $5,326 Implemented
MO0253 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,507 $5,843 Not Implemented
MO0253 # 03 Y:1999 03 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,044 $40 Implemented
MO0253 # 04 Y:1999 04 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,393 $58 Implemented
MO0253 # 05 Y:1999 05 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,322 $0 Implemented
MO0253 # 06 Y:1999 06 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $63,081 $12,600 Not Implemented
MO0253 # 07 Y:1999 07 1999 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $14,000 $3,700 Implemented
MO0253 # 08 Y:1999 08 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $329 $714 Not Implemented
MO0252 # 01 Y:1999 01 1999 INSTALL SENSORS TO DETECT DEFECTS $101,434 $15,624 Implemented
MO0252 # 02 Y:1999 02 1999 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $5,875 $10,000 Implemented
MO0252 # 03 Y:1999 03 1999 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $422 $34 Implemented
MO0252 # 04 Y:1999 04 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,134 $4,647 Not Implemented
MO0252 # 05 Y:1999 05 1999 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,315 $53 Not Implemented
MO0252 # 06 Y:1999 06 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,006 $40 Not Implemented
MO0252 # 07 Y:1999 07 1999 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,877 $4,372 Implemented