Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,332

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0201 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,419 $334 Implemented
MO0201 # 09 Y:1997 09 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,891 $80 Implemented
MO0201 # 10 Y:1997 10 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,341 $3,144 Implemented
MO0201 # 11 Y:1997 11 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $922 Implemented
MO0201 # 12 Y:1997 12 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $623 $1,346 Implemented
MO0199 # 01 Y:1997 01 1997 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $216,153 $80,000 Implemented
MO0199 # 02 Y:1997 02 1997 RECOVER AND REUSE COOLING WATER $20,939 $19,000 Implemented
MO0199 # 03 Y:1997 03 1997 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME $25,800 $20,000 Implemented
MO0199 # 04 Y:1997 04 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $18,045 $15,000 Implemented
MO0199 # 05 Y:1997 05 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $10,080 $10,000 Implemented
MO0199 # 06 Y:1997 06 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $4,940 $9,500 Implemented
MO0199 # 07 Y:1997 07 1997 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $38,120 $550 Implemented
MO0199 # 08 Y:1997 08 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,447 $28,282 Implemented
MO0199 # 09 Y:1997 09 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,878 $80 Not Implemented
MO0198 # 01 Y:1997 01 1997 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM $19,395 $15,000 Implemented
MO0198 # 02 Y:1997 02 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $7,440 $4,500 Implemented
MO0198 # 03 Y:1997 03 1997 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $3,488 $10,000 Not Implemented
MO0198 # 04 Y:1997 04 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $5,544 Implemented
MO0198 # 05 Y:1997 05 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $1,790 Implemented
MO0198 # 06 Y:1997 06 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $0 Implemented
MO0198 # 07 Y:1997 07 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $243 $48 Implemented
MO0198 # 08 Y:1997 08 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $152 $40 Not Implemented
MO0198 # 09 Y:1997 09 1997 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $4,582 $8,400 Not Implemented
MO0198 # 10 Y:1997 10 1997 RECOVER AND REUSE WASTE MATERIAL $276 $0 Implemented
MO0198 # 11 Y:1997 11 1997 USE EVAPORATION TO CONCENTRATE MATERIAL $6,176 $18,000 Not Implemented