IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,332

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0107 # 12 Y:1994 12 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,162 $1,547 Implemented
MO0107 # 13 Y:1994 13 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $460 $40 Implemented
MO0106 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,914 $1,064 Implemented
MO0106 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,563 $17,608 Implemented
MO0106 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $5,231 $12,500 Not Implemented
MO0106 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,241 $1,195 Implemented
MO0106 # 05 Y:1994 05 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $917 $1,244 Implemented
MO0106 # 06 Y:1994 06 1994 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $838 $175 Implemented
MO0106 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,809 $50 Implemented
MO0106 # 08 Y:1994 08 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $925 $301 Not Implemented
MO0106 # 09 Y:1994 09 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,096 $4,794 Implemented
MO0106 # 10 Y:1994 10 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $303 $130 Implemented
MO0105 # 01 Y:1993 01 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $67,868 $8,774 Not Implemented
MO0105 # 02 Y:1993 02 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,635 $100 Implemented
MO0105 # 03 Y:1993 03 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $204 $0 Implemented
MO0105 # 04 Y:1993 04 1993 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $43,359 $7,325 Not Implemented
MO0105 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $1,024 Implemented
MO0105 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,317 $31,982 Implemented
MO0105 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,548 $1,125 Implemented
MO0105 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,346 $777 Implemented
MO0105 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $907 $554 Implemented
MO0105 # 10 Y:1993 10 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $334 $20 Implemented
MO0104 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,658 $1,695 Implemented
MO0104 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $8,592 $13,864 Implemented
MO0104 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,920 $9,730 Implemented