Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
33
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MS0449 # 06 Y:2025 | 06 | 2025 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $21,369 | $10,437 | n/a |
MS0449 # 05 Y:2025 | 05 | 2025 | RECOVER AND REUSE WASTE MATERIAL | $24,000 | $14,060 | n/a |
MS0449 # 04 Y:2025 | 04 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $11,235 | $15,450 | n/a |
MS0449 # 03 Y:2025 | 03 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $10,000 | $18,185 | n/a |
MS0449 # 02 Y:2025 | 02 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,428 | $5,389 | n/a |
MS0449 # 01 Y:2025 | 01 | 2025 | INSTALL REPLACEMENT DOORS | $13,143 | $8,336 | n/a |
MS0448 # 05 Y:2025 | 05 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $24,271 | $200,000 | n/a |
MS0448 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $217,439 | $973,557 | n/a |
MS0448 # 02 Y:2025 | 02 | 2025 | AIR CONDITION ONLY SPACE NECESSARY | $48,357 | $35,751 | n/a |
MS0448 # 03 Y:2025 | 03 | 2025 | INSTALL REPLACEMENT DOORS | $10,741 | $15,697 | n/a |
MS0448 # 04 Y:2025 | 04 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,225 | $34,284 | n/a |
MS0448 # 06 Y:2025 | 06 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $8,205 | $72,000 | n/a |
MS0447 # 02 Y:2025 | 02 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $80,000 | $30,005 | n/a |
MS0447 # 06 Y:2025 | 06 | 2025 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $2,030,279 | $11,484,200 | n/a |
MS0447 # 05 Y:2025 | 05 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $144,047 | $116,128 | n/a |
MS0447 # 04 Y:2025 | 04 | 2025 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $43,724 | $145,930 | n/a |
MS0447 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $56,915 | $6,958 | n/a |
MS0447 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $668,474 | $6,707,386 | n/a |
MS0446 # 04 Y:2025 | 04 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $17,927 | $24,500 | n/a |
MS0446 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,646 | $4,652 | n/a |
MS0446 # 02 Y:2025 | 02 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $25,744 | $100,000 | n/a |
MS0446 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $66,685 | $716,889 | n/a |
MS0445 # 07 Y:2025 | 07 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $27,723 | $35,999 | n/a |
MS0445 # 06 Y:2025 | 06 | 2025 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $5,573 | $2,502 | n/a |
MS0445 # 05 Y:2025 | 05 | 2025 | LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT | $12,178 | $45,000 | n/a |