Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
702
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MU0062 # 01 Y:2024 | 01 | 2024 | COVER OPEN TANKS | $10,932 | $2,523 | n/a |
MU0062 # 07 Y:2024 | 07 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235 | $530 | n/a |
MU0062 # 05 Y:2024 | 05 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $216 | $0 | n/a |
MU0062 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,416 | $780 | n/a |
MU0062 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,013 | $1,482 | n/a |
MU0062 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $2,520 | $98 | n/a |
MU0062 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,453 | $260 | n/a |
MU0061 # 04 Y:2024 | 04 | 2024 | INSTALL SET-BACK TIMERS | $24,478 | $160,704 | n/a |
MU0061 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $3,468 | $4,140 | n/a |
MU0061 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $246 | $339 | n/a |
MU0061 # 08 Y:2024 | 08 | 2024 | INSTALL TIMERS AND/OR THERMOSTATS | $393 | $580 | n/a |
MU0061 # 09 Y:2024 | 09 | 2024 | INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE | $370 | $1,608 | n/a |
MU0061 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,134 | $0 | n/a |
MU0061 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $89 | $114 | n/a |
MU0061 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,426 | $12,734 | n/a |
MU0061 # 07 Y:2024 | 07 | 2024 | USE RADIANT HEATER FOR SPOT HEATING | $2,592 | $10,260 | n/a |
MUCM26 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $379 | $2,196 | n/a |
MUCM26 # 03 Y:2024 | 03 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $58 | $0 | n/a |
MUCM26 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $547 | $1,881 | n/a |
MUCM26 # 02 Y:2024 | 02 | 2024 | USE OPTIMUM TEMPERATURE | $32 | $0 | n/a |
MUCM26 # 01 Y:2024 | 01 | 2024 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $2,717 | $0 | n/a |
MUCM26 # 05 Y:2024 | 05 | 2024 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $171 | $0 | n/a |
MUCM25 # 05 Y:2024 | 05 | 2024 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $359 | $0 | n/a |
MUCM25 # 07 Y:2024 | 07 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,443 | $13,685 | n/a |
MUCM25 # 06 Y:2024 | 06 | 2024 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $193 | $307 | n/a |