IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

141

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0300 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $783 $460 Not Implemented
MZ0300 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,074 $5,200 Not Implemented
MZ0300 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,728 $4,770 Not Implemented
MZ0300 # 05 Y:2020 05 2020 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,678 $3,310 Not Implemented
MZ0300 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,784 $200 Implemented
MZ0300 # 07 Y:2020 07 2020 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $11,578 $3,168 Not Implemented
MZ0297 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,041 $51,700 Implemented
MZ0297 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $773 $320 Not Implemented
MZ0297 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $7,129 $24,780 Implemented
MZ0297 # 04 Y:2020 04 2020 INSTALL OCCUPANCY SENSORS $320 $840 Implemented
MZ0297 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,880 $2,595 Implemented
MZ0297 # 06 Y:2020 06 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,857 $350 Implemented
MZ0297 # 07 Y:2020 07 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,001 $1,050 Not Implemented
MZ0297 # 08 Y:2020 08 2020 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT $397 $300 Implemented
MZ0288 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,689 $41,089 Not Implemented
MZ0288 # 02 Y:2020 02 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,118 $3,400 Not Implemented
MZ0288 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,574 $1,660 Not Implemented
MZ0288 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,502 $3,320 Not Implemented
MZ0288 # 05 Y:2020 05 2020 RECOVER WASTE HEAT FROM EQUIPMENT $424 $430 Not Implemented
MZ0294 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $75,290 $44,400 Not Implemented
MZ0294 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,816 $13,638 Not Implemented
MZ0294 # 03 Y:2020 03 2020 INSTALL OCCUPANCY SENSORS $1,295 $2,760 Implemented
MZ0294 # 04 Y:2020 04 2020 INSTALL SPECTRAL REFLECTORS / DELAMP $519 $160 Not Implemented
MZ0294 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $506 $50 Implemented
MZ0294 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $542 $240 Not Implemented