Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
83
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0260 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $12,057 | $59,524 | Not Implemented |
MZ0260 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,122 | $23,576 | Not Implemented |
MZ0260 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $32,450 | $7,600 | Implemented |
MZ0260 # 02 Y:2018 | 02 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $577 | $450 | Implemented |
MZ0260 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,384 | $25,688 | Implemented |
MZ0259 # 04 Y:2018 | 04 | 2018 | RECOVER AND REUSE COOLING WATER | $63,427 | $203,000 | Implemented |
MZ0259 # 03 Y:2018 | 03 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $140,488 | $304,000 | Not Implemented |
MZ0259 # 02 Y:2018 | 02 | 2018 | INSTALL OCCUPANCY SENSORS | $504 | $780 | Implemented |
MZ0259 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,010 | $29,034 | Implemented |
MZ0258 # 05 Y:2018 | 05 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,199 | $420 | Not Implemented |
MZ0258 # 01 Y:2018 | 01 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,136 | $1,400 | Not Implemented |
MZ0258 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $17,450 | $5,000 | Implemented |
MZ0258 # 03 Y:2018 | 03 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,883 | $6,200 | Not Implemented |
MZ0258 # 04 Y:2018 | 04 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,728 | $3,200 | Implemented |
MZ0258 # 06 Y:2018 | 06 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,344 | $1,800 | Implemented |
MZ0258 # 07 Y:2018 | 07 | 2018 | USE OPTIMUM THICKNESS INSULATION | $4,597 | $2,989 | Not Implemented |
MZ0257 # 07 Y:2018 | 07 | 2018 | USE OPTIMUM THICKNESS INSULATION | $7,678 | $7,480 | Implemented |
MZ0257 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $490 | $2,925 | Not Implemented |
MZ0257 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $869 | $5,414 | Not Implemented |
MZ0257 # 03 Y:2018 | 03 | 2018 | INSTALL OCCUPANCY SENSORS | $1,472 | $3,025 | Not Implemented |
MZ0257 # 04 Y:2018 | 04 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,225 | $1,800 | Implemented |
MZ0257 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,826 | $0 | Implemented |
MZ0257 # 06 Y:2018 | 06 | 2018 | INSULATE BARE EQUIPMENT | $600 | $752 | Implemented |
MZ0257 # 08 Y:2018 | 08 | 2018 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $839 | $1,900 | Implemented |
MZ0257 # 12 Y:2018 | 12 | 2018 | MINIMIZE WATER USAGE | $37,478 | $0 | Implemented |