Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,985
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0144 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,617 | $4,731 | Implemented |
NC0144 # 05 Y:1998 | 05 | 1998 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $113 | $200 | Implemented |
NC0144 # 06 Y:1998 | 06 | 1998 | METER WASTE WATER | $1,464 | $200 | Implemented |
NC0144 # 07 Y:1998 | 07 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $5,550 | $2,700 | Implemented |
NC0144 # 08 Y:1998 | 08 | 1998 | USE EVAPORATION TO CONCENTRATE MATERIAL | $2,325 | $12,000 | Not Implemented |
NC0146 # 01 Y:1998 | 01 | 1998 | COVER OPEN TANKS | $488 | $600 | Implemented |
NC0146 # 02 Y:1998 | 02 | 1998 | INSULATE BARE EQUIPMENT | $920 | $800 | Implemented |
NC0146 # 03 Y:1998 | 03 | 1998 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $409 | $1,480 | Implemented |
NC0146 # 04 Y:1998 | 04 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $178 | $200 | Implemented |
NC0146 # 05 Y:1998 | 05 | 1998 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $13,890 | $1,500 | Implemented |
NC0146 # 06 Y:1998 | 06 | 1998 | REDUCE SOLUTION DRAG-OUT TO PREVENT SOLUTION LOSS | $2,431 | $0 | Implemented |
NC0143 # 01 Y:1998 | 01 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,467 | $700 | Implemented |
NC0143 # 02 Y:1998 | 02 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $50,294 | $280,937 | Not Implemented |
NC0143 # 03 Y:1998 | 03 | 1998 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,615 | $25,600 | Not Implemented |
NC0143 # 04 Y:1998 | 04 | 1998 | REDUCE FLUID FLOW RATES | $2,040 | $2,500 | Not Implemented |
NC0143 # 05 Y:1998 | 05 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,191 | $30,000 | Not Implemented |
NC0143 # 06 Y:1998 | 06 | 1998 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $45,561 | $55,000 | Not Implemented |
NC0142 # 01 Y:1998 | 01 | 1998 | INSTALL TIMERS AND/OR THERMOSTATS | $2,463 | $1,050 | Implemented |
NC0142 # 02 Y:1998 | 02 | 1998 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,239 | $0 | Implemented |
NC0142 # 03 Y:1998 | 03 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,688 | $1,200 | Implemented |
NC0142 # 04 Y:1998 | 04 | 1998 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,769 | $9,000 | Not Implemented |
NC0142 # 05 Y:1998 | 05 | 1998 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $2,977 | $1,448 | Not Implemented |
NC0142 # 06 Y:1998 | 06 | 1998 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,279 | $31,754 | Implemented |
NC0142 # 07 Y:1998 | 07 | 1998 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $2,435 | $10 | Implemented |
NC0142 # 08 Y:1998 | 08 | 1998 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $375 | $200 | Not Implemented |