IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0149 # 03 Y:1998 03 1998 PURCHASE APPROPRIATELY SIZED MATERIAL $6,400 $1,000 Implemented
NC0149 # 04 Y:1998 04 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $938 $200 Implemented
NC0149 # 05 Y:1998 05 1998 RECYCLE CLEANING SOLVENT AND REUSE $1,472 $100 Implemented
NC0149 # 06 Y:1998 06 1998 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,320 $800 Implemented
NC0150 # 01 Y:1998 01 1998 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $920 $400 Not Implemented
NC0150 # 02 Y:1998 02 1998 RECOVER WASTE HEAT FROM EQUIPMENT $1,383 $819 Not Implemented
NC0150 # 03 Y:1998 03 1998 RECOVER WASTE HEAT FROM EQUIPMENT $729 $1,532 Not Implemented
NC0150 # 04 Y:1998 04 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $244 $800 Implemented
NC0150 # 05 Y:1998 05 1998 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,244 $4,400 Implemented
NC0150 # 06 Y:1998 06 1998 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $14,434 $500 Not Implemented
NC0150 # 07 Y:1998 07 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,216 $16,000 Not Implemented
NC0148 # 01 Y:1998 01 1998 RECOVER WASTE HEAT FROM EQUIPMENT $2,914 $10,000 Not Implemented
NC0148 # 02 Y:1998 02 1998 REDUCE FLUID FLOW RATES $304 $550 Implemented
NC0148 # 03 Y:1998 03 1998 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,677 $10,000 Implemented
NC0148 # 04 Y:1998 04 1998 INSTALL EQUIPMENT TO MOVE PRODUCT $63,429 $80,000 Implemented
NC0144 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,673 $14,934 Not Implemented
NC0144 # 02 Y:1998 02 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,664 $1,000 Implemented
NC0144 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,696 $12,000 Not Implemented
NC0144 # 04 Y:1998 04 1998 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $2,617 $4,731 Implemented
NC0144 # 05 Y:1998 05 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $113 $200 Implemented
NC0144 # 06 Y:1998 06 1998 METER WASTE WATER $1,464 $200 Implemented
NC0144 # 07 Y:1998 07 1998 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $5,550 $2,700 Implemented
NC0144 # 08 Y:1998 08 1998 USE EVAPORATION TO CONCENTRATE MATERIAL $2,325 $12,000 Not Implemented
NC0146 # 01 Y:1998 01 1998 COVER OPEN TANKS $488 $600 Implemented
NC0146 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $920 $800 Implemented