IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,176

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0086 # 02 Y:1996 02 1996 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $541 $0 Implemented
NC0086 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $495 $900 Implemented
NC0086 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $915 $2,478 Implemented
NC0086 # 05 Y:1996 05 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $831 $2,475 Not Implemented
NC0086 # 06 Y:1996 06 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $150 Implemented
NC0086 # 07 Y:1996 07 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $107 $600 Implemented
NC0086 # 08 Y:1996 08 1996 MINIMIZE WATER USAGE $1,104 $900 Implemented
NC0086 # 09 Y:1996 09 1996 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $494 $600 Implemented
NC0086 # 10 Y:1996 10 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $6,250 $7,000 Implemented
NC0084 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,895 $10,000 Implemented
NC0084 # 02 Y:1996 02 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,441 $3,000 Implemented
NC0084 # 03 Y:1996 03 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,833 $400 Implemented
NC0084 # 04 Y:1996 04 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,498 $1,700 Implemented
NC0084 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,744 $600 Not Implemented
NC0084 # 06 Y:1996 06 1996 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $6,221 $5,100 Not Implemented
NC0084 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,284 $640 Not Implemented
NC0084 # 08 Y:1996 08 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,827 $2,970 Implemented
NC0084 # 09 Y:1996 09 1996 INSULATE BARE EQUIPMENT $932 $549 Implemented
NC0084 # 10 Y:1996 10 1996 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,582 $4,720 Not Implemented
NC0084 # 11 Y:1996 11 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,960 $2,000 Implemented
NC0084 # 12 Y:1996 12 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $25,015 $18,000 Implemented
NC0084 # 13 Y:1996 13 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $20,000 $2,000 Not Implemented
NC0080 # 01 Y:1996 01 1996 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $93 $180 Implemented
NC0080 # 02 Y:1996 02 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $302 $100 Not Implemented
NC0080 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $414 $600 Implemented